The wall sticking of half wet material is concerned to the structure, fixing and operation of spray drying tower and sprayer, the motion of hot air in tower.
半湿物料粘壁主要与喷雾干燥塔结构、雾化器结构、安装、操作以及热风在塔内的运动状态有关。物料熔点低于干燥温度时容易产生热熔性粘壁。
This paper describes the mechanism of spraying device with combined disc and air-blast atomization for the 1.18kW. Power operated knapsack sprayer and its characteristics.
探讨了用于1.18千瓦背负式机动喷雾机的转盘和气力组合雾化多用喷雾装置的雾化机理及其特点。
Remove its plastic head, aim it at the admitting pipe of the air filter, push the sprayer, spray it for 1-3 seconds and then start the engine.
取下塑料盖后,对准空气滤清器的进气管,按下喷头正喷约1 ~ 3秒,然后启动即可。
The machine comprises three parts which are a power supply, an air pressure jet flow air-water mixture sprayer and a gas source of an oxygen source ozone generator, and the like;
它由电源、气压射流气水混合喷雾器、氧气源臭氧发生器气源等三大部分组成;
The wall sticking of half wet material is concerned to the structure, fixing and operation of spray drying tower and sprayer, the motion of hot air in tower.
介绍用于立式压力喷雾干燥塔的热风分配器改造后的结构与工作原理。
The wall sticking of half wet material is concerned to the structure, fixing and operation of spray drying tower and sprayer, the motion of hot air in tower.
介绍用于立式压力喷雾干燥塔的热风分配器改造后的结构与工作原理。
应用推荐