• The second would be the high level of design quality of all engineering aspects of high speed railway projects so that project implementation is carried out without any technical changes.

    确保高速铁路项目工程设计各方面质量从而使项目可以顺利实施无须任何技术变更。

    youdao

  • The second would be the high level of design quality of all engineering aspects of high speed railway projects so that project implementation is carried out without any technical changes.

    确保高速铁路项目工程设计各方面质量从而使项目可以顺利实施无须任何技术变更。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定