• Total length of the tunnel is over 500 km. Having an underground parking lot is a must.

    500多千米长的巷道地下停车场必备

    youdao

  • With a total construction area of 20455 m2, the project sets up one underground parking lot, with an area of 9705 m2, having 259 parking Spaces and 2 entries and exits and forming smooth loop traffic.

    工程建筑面积20455平方米。建设地下停车场处,建筑面积9705平方米,259个停车位出入口,形成顺畅环形交通

    youdao

  • With a total construction area of 20455 m2, the project sets up one underground parking lot, with an area of 9705 m2, having 259 parking Spaces and 2 entries and exits and forming smooth loop traffic.

    工程建筑面积20455平方米。建设地下停车场处,建筑面积9705平方米,259个停车位出入口,形成顺畅环形交通

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定