Total length of the tunnel is over 500 km. Having an underground parking lot is a must.
在500多千米长的巷道,地下停车场是必备的。
With a total construction area of 20455 m2, the project sets up one underground parking lot, with an area of 9705 m2, having 259 parking Spaces and 2 entries and exits and forming smooth loop traffic.
该工程总建筑面积20455平方米。建设地下停车场一处,建筑面积9705平方米,有259个停车位,设两个出入口,形成顺畅的环形交通。
With a total construction area of 20455 m2, the project sets up one underground parking lot, with an area of 9705 m2, having 259 parking Spaces and 2 entries and exits and forming smooth loop traffic.
该工程总建筑面积20455平方米。建设地下停车场一处,建筑面积9705平方米,有259个停车位,设两个出入口,形成顺畅的环形交通。
应用推荐