This method consists of the following procedures: backfill, consolidation grouting, reinforcing by the pipe and strut method, controlled blasting and anchor bars.
该工法包括回填和固结灌浆、管棚加固、控制爆破和喷锚等工序。
This method consists of the following procedures: backfill, consolidation grouting, reinforcing by the pipe and strut method, controlled blasting and anchor bars.
该工法包括回填和固结灌浆、管棚加固、控制爆破和喷锚等工序。
应用推荐