It may be as simple as an email approval but you need to get it in writing that the new feature is being added to the project and the subsequent impact that will have on the schedule and budget.
变更流程可能像批复邮件一样简单,但是你有必要记录下来:新特性加入到了项目中、它对进度和预算将产生怎样的影响。
Test motivators are documents that may relate to the test effort, such as a project schedule, a requirements document, or a project plan.
测试激发因素是和测试努力相关的文档,例如一个项目进度表、一个需求文档、或者一个项目计划。
And then, as the overall project goals change, the schedule probably is thrown away and never revisited.
然后,随着整体的项目目标的改变,那个进度安排被丢弃并且决不再看。
This wasn't a particularly large number, and some of them (such as the challenging schedule) would last until the final leg of the project.
这并不是一个非常大的数字,其中的一些风险(比如有挑战的时间进度计划)直到项目的最后时期都会存在。
[The shop] is designed as a permanently temporary space with the flexibility to respond to the gallery's fast-changing exhibition and project schedule.
(该店)被设计为一个永久性的临时空间,它的灵活性可以应对画廊不断变化的展览和项目日程。
Whilst, in this example I have not created the parameters as shared parameters, in a proper project example I would, as I would ideally like to schedule the parameters as well as tag the units.
与此同时,我在这个案例中并没有设置之前分享过的那些参数,在一个合适的工程项目中,我会理想化地调整参数和链接单元。
Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.
以某海洋石油工程项目的进度控制管理为例,阐述在设计阶段网络计划的编制、设计过程中进度控制的方法和手段。
However, owing to the outdated project management system and nonstandard architectural market, there exist some problems such as schedule control, operation management and bidding, etc.
但由于当时水利工程管理体制的落后及建筑市场的不规范,在进度控制、运行管理、招投标等方面存在一些问题。
In order to maintain the project schedule it is important that the coring operations be carried out as efficiently and trouble free as possible.
为了维持项目时间表,高效地而且无故障地进行取岩心作业是很重要的。
The risk register includes information such as the risk owner, cause, effect, status, probability, impact of the risk on the project cost, schedule and customer.
风险登记簿包含的信息有风险责任人、成因、效应、状态、概率、风险对项目费用、进度和客户的影响等。
Firstly, cost, quality and schedule which are the main factors of engineering project management is integrated as a whole. The base of integrated management of total factors is established.
首先,全要素成本集成管理视工程项目管理的“主要要素”——成本、进度和质量为一个整体,奠定了项目全要素集成化管理的基础。
Along with the increase of the requirements on software system, more and more questions which will result in software project failure appear, such as budget excess and schedule delay.
随着软件系统需求的不断增长,导致项目失败或者延期、超出预算或品质低劣的问题也越来越多。
But as on a movie shoot, it soon became apparent the project was going to grow beyond its planned schedule and budget.
然而,如同拍电影一样,翻修工程很快就超出了早前计划好的进度和预算。
Present international conventional "earned value evaluation principle" as well as how to combine the earned value with project schedule control and cost control organically were also expounded.
阐述当前国际通用的赢得值评估原理,以及如何将赢得值与项目进度控制和费用控制有机地联系起来。
List any assumed factors (as opposed to known facts) that could affect the schedule of the project.
列出所有影响项目进度的假设因素(相对于已知的因素)。
As an architecture studio, this course is project based and the schedule reflects various stages of project work broken into smaller segments.
作为建筑工作室,本课程是以专题为基础,进度表也反映专题分成部份的各个阶段。
To keep the report accurate, you might also want to run the report again on a particular schedule, such as every week or at each project milestone.
为了保持报表的准确性,您可能还要按照特定的计划(例如每周或每个项目里程碑)再次运行该报表。
However, a critical path can end, as an example, on a schedule milestone that is in the middle of the project schedule and that has a finish-no-later-than imposed date schedule constraint.
然而,可举例说明,关键路线可以止于处于项目进度表中间,并受到“不迟于完成”类型的强加日期进度约束的某一计划里程碑。
Therefore, we hope we can cooperate with each other very well in the future to push forward this project and ensure the project will be completed as schedule and start operation as soon as possible.
为此,希望各方进一步加强沟通,密切配合,科学调度,全力以赴,加快项目推进,确保按计划如期竣工,投入生产。
One of the most important things the shares holder CARES is that the project can be fulfilled successfully and timely as the schedule, which is the critical item of project Management.
一个项目能否在预定计划时间内完成并交付使用,这是投资者最关心的问题之一,也是项目管理工作的重要内容。
Each design team will discuss briefly the progress in the project hours, as indicated in the Class schedule.
如同在课程表中所订,每个设计小组在专题时间将会大略讨论整个进度。
Schedule for the management of the importance of project management, Xin-Yuan, as well as in the actual progress of the project to take advantage.
时间进度管理对于项目管理的重要性,以及鑫苑公司在实际工程中的采取进度的优越性。
Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc. in this paper.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to (75) progress.
制订进度过程要求对历时估算和资源估算进行评审和修订,从而产生一个经过认可的项目进度作为对项目进展进行追踪的基准。
The optimization schedule models and simulation of CPL are created, and the simulation system is developed, which is run by a CPL in Chongqing as the project background.
建立了优化调度模型和优化调度仿真模型,研制了仿真系统,并以重庆某卷烟厂生产线为工程背景进行了仿真。
And please give delivery instructions within the time limit as soon as possible, to complete the project on schedule, deposit be refunded.
并且请在期限内尽快给予发货指示,按期完成项目,保证金予以退还。
And please give delivery instructions within the time limit as soon as possible, to complete the project on schedule, deposit be refunded.
并且请在期限内尽快给予发货指示,按期完成项目,保证金予以退还。
应用推荐