• The practice indicates that the asphalt concrete ADAPTS to the core wall of earth-rock dam in the cold region.

    实践表明,浇筑式沥青混凝土适用寒冷地区石坝防渗

    youdao

  • The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.

    尼尔基水利枢纽工程主坝结构形式为沥青混凝土砂砾石坝

    youdao

  • The major dam of Nierji water project is an earth- rockfill dam with asphalt concrete core.

    尼尔基工程主坝沥青混凝土心墙石坝,主坝工程施工采用两期导流方式。

    youdao

  • These results can be referenced to the plan of water level procedures on the dam; and the behaviors of high rockfill dam with asphalt concrete core under high water head are studied.

    研究结果可供大坝蓄水计划参考,水头沥青混凝土心墙运行提供一定的参考。

    youdao

  • Maopingxi high rockfill dam is the accessorial dam of Three Gorges Project (TGP), which is also the highest rockfill dam with asphalt concrete core in China.

    茅坪溪防护三峡工程坝,也是目前中国最高沥青混凝土心墙坝。

    youdao

  • This rolling construction technology of asphalt concrete core wall in Maopingxi earth and rockfill dam of TGP was the first application in China.

    三峡茅坪溪防护石坝沥青混凝土骑缝碾压施工工艺国内首创的施工方法。

    youdao

  • The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body goo…

    碾压沥青混凝土以及过渡带施工主坝坝体填筑同步进行

    youdao

  • The material of the main dam shuck is mainly the local sandy gravel. The clay core and the asphalt concrete core were compared in the choosing of seepage prevention type.

    拦河主坝坝当地材料砂砾为主防渗比较粘土墙、沥青混凝土心墙和斜墙型式

    youdao

  • The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.

    碾压沥青混凝土以及过渡带施工主坝坝体填筑同步进行

    youdao

  • The major dam of Nierji water project is an earth - rockfill dam with asphalt concrete core. The construction diversion is used two stages.

    尼尔基工程主坝沥青混凝土石坝,主坝工程施工采用导流方式

    youdao

  • Asphalt concrete core-wall rockfill dam is one of the main types of earth-rock dam.

    沥青混凝土心墙堆石坝石坝主要之一

    youdao

  • The principle part of the dam which plays a supporting role is made of moraines and gravel and its middle position setting asphalt concrete core-wall plays an anti-seepage role.

    大坝主体由堆石坝或砾石组成支撑作用中间设置沥青混凝土心墙起防渗作用。

    youdao

  • The principle part of the dam which plays a supporting role is made of moraines and gravel and its middle position setting asphalt concrete core-wall plays an anti-seepage role.

    大坝主体由堆石坝或砾石组成支撑作用中间设置沥青混凝土心墙起防渗作用。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定