The psychologist always assign work to each researcher.
这位心理学家总是将工作分派给每个研究员。
Easily assign work items for testing and inclusion to a build.
简单地为一个构建安排工作条目的测试和包含内容。
This method may be useful in extensions to this class that re-assign work in systems with multiple pools.
当系统中存在多个线程池时,此方法或许对于此类的扩展类在进行作业重新分配时是有用的。
The most effective way for managers to assign work is to divide complex tasks into their simpler component parts.
经理指派工作的最有效的方法是把负责的工作分成比较简单的组成部分。
This tells Teamworks not to assign work to people, but to the System, which is a predefined role for the automated steps.
通知teamworks不要分配工作给人,而是分配给系统,这是自动化流程的一个预定义角色。
Finally, as the software architect works closely with the project manager, the structure of the architecture is used to assign work to teams.
最后,当软件架构师与项目管理人员紧密地协同工作时,将根据体系结构的结构为不同的团队分配相应的工作。
When you plan, you estimate, find out that you cannot do everything that you want to do, negotiate scope, put dates to deliverables, and assign work.
在您计划时,您要估计,发现您不能完成您想要做的一切事情,商议范围,确定交付日期并且分配工作。
In managing the project plan, the project manager must work with the technical leads of the project to assign work, and to assess work completion.
在管理这个项目的计划中,项目经理必须与这个项目的技术领导者一起合作,来评估工作的完成进度。
Assign work for design engineers, cooperate with related people to solve problems arising during the course of design. Control the design progress.
安排设计师的工作,协调解决设计过程出现的问题,控制设计进度;
Solve die problem on line and off line, work with process engineer to solve problem and assign work hours to technician, and check the maintenance result.
处理在线和离线模具问题,与工艺工程师一起制定解决方案并确定维修工时,检查维修结果。
Or maybe the notion of three levels of definitions feels like more than you're ready to use, and you just want to assign work to people and have them complete it.
或者感觉这个定义的三个水平的观念您已经准备好去使用了,而且您仅仅是想要将这个工作分配到个人,并去完成它。
Software architecture is the responsibility of the software architect, who USES it to communicate with stakeholders, provide accountability, and assign work to teams.
软件体系结构是软件架构师的职责,他们使用体系结构与干系人进行沟通,提供可说明性,并为不同的团队分配工作。
Then you use this data to assign work to different developers on the team, and to track their progress during the project. This approach provides the following benefits.
然后,使用此数据将工作分配给团队中的不同开发人员,并在项目期间跟踪进度。
Mappings are created for the user roles in the user security registry, then imported into Modeler, so that any design to deploy processes can properly assign work to users in the test environment.
为用户安全注册中心的用户角色创建映射,然后导入Modeler,以便任何“为部署而设计”流程能够在测试环境中为用户正确分配工作。
Team members can also take those work items and assign them to an iteration plan.
团队成员还可以拿到那些工作项,并且将它们分配到迭代计划中。
With the basic report, you could assign every object a different object template file, but that would be a lot of work.
有了基本报告,您可以向每一个对象分配不同的对象模板文件,但是这种工作干起来可能十分繁琐。
An administrator can also assign an access control list to each work node for additional security control at the work node level.
管理员也可以为每个工作节点分配访问控制列表,进一步在工作节点级别上进行安全控制。
Instead of having them work ahead, you assign them part time to the Inception phase for a second project.
取代让他们提前工作,您可以将他们的部分时间分配到第二个项目的初始阶段去。
Another way to assign and monitor work is the Developer's Taskboard, which shows the tasks assigned to individuals in columns that indicate which tasks they have already started or completed.
另外一种分配和监视工作的方法就是开发员的任务板,它显示了列中分配给个人的任务,它意味着有哪些任务已经开始,哪些已经完成。
Workflow applications can assign variables to a work package.
工作流应用程序可以为工作包分配变量。
To understand how to create work items and assign them to users, review this topic: create a work item and assign it to a user.
要理解如何创建工作条目以及如何为用户分配任务,查阅这个话题:创建一个工作条目及将它分配给用户。
Work items can be linked to records that are not change management-related and can be used to assign and track work.
工作项可以与和变更管理不相关的记录联系起来,并且可以用于分配和追踪工作。
When actually performing this work in a project, a project manager can still decide whether to assign one person per role or to have that person perform several roles at the same time.
实际上,当在一个项目中执行某个工作时,项目经理仍然可以决定是否一人一个角色或者一人同时执行多个角色。
Grant had two options: he could assign Sam busy work to keep him occupied until he was assigned elsewhere, or he could give him the coaching and support he needed to do real work and succeed.
哥兰特有两个选择:他可以安排萨姆满负荷地工作,占用他所有时间直到他再被分到其他地方,或者另一个选择他给他以指导,支持帮助他做那些真正的项目工作,并帮助他成功完成。
In addition to setting up simple workflows for reviews, you can assign sections of the test plan for others to work on by creating work items, as shown in Figure 2 below.
除了为检查创建简单的工作流程,您还可以通过创建工作项,来向其他人分配测试计划的任务。如图2所示。
You need to assign this work item to the team lead, John, so change the Owned By field to John.
您需要将这个工作条目分配给团队领导,John,这样就可以将Owned By区域更改为John。
The test manager can create work items that correspond to Rational Performance Tester scripts to be developed and assign the work items to available team members.
测试管理员可以创建与RationalPerformance tester脚本相关的工作项,并向团队成员分配工作项。
The test manager can create work items that correspond to Rational Performance Tester scripts to be developed and assign the work items to available team members.
测试管理员可以创建与RationalPerformance tester脚本相关的工作项,并向团队成员分配工作项。
应用推荐