Measures dealing with several technical problems often occurred during construction of cast-in-situ concrete piles are expounded based on the construction practice of some projects.
根据几个工程的施工实践,阐述钻孔灌注桩施工中经常发生的几个技术问题的处理措施。
The Inspection of concrete strength of cast in situ piles by Ultrasonic is to identify concrete strength at the same time to test uniformity and integrality of pile body.
超声检测灌注桩混凝土强度是指在超声检测桩身混凝土匀质性、完整性的同时确定桩身混凝土的强度。
The three-dimensional effects of pile head and applicability of plane-section assumption are main problems in low strain dynamic tests on cast-in-situ concrete thin-wall pipe piles.
现浇薄壁管桩低应变检测时,存在桩头三维效应以及平截面假定的适应性问题。
A 3d model was established for the composite foundation with cast-in-situ concrete thin-wall pipe piles. It was shown by the results of finite element analysis that the present model was reasonable.
建立现浇薄壁管桩复合地基三维模型,通过有限元模拟,与现场静载试验结果对比,表明建立的模型是可行的。
A 3d model was established for the composite foundation with cast-in-situ concrete thin-wall pipe piles. It was shown by the results of finite element analysis that the present model was reasonable.
建立现浇薄壁管桩复合地基三维模型,通过有限元模拟,与现场静载试验结果对比,表明建立的模型是可行的。
应用推荐