• For tunnel sections with good surrounding rocks, the U-shaped rock-bolted section is selected as a final optimized section instead of the original circular reinforcement concrete lining section.

    隧洞围岩条件良好洞段,论证取消隧洞圆形钢筋混凝土衬砌,选定马蹄形锚喷断面作为最终优化断面形式。

    youdao

  • The elastoplastic problem for circular pressured tunnel with lining is investigated.

    研究含衬砌圆形压力隧洞塑性问题

    youdao

  • The elastoplastic problem for circular pressured tunnel with lining is investigated.

    研究含衬砌圆形压力隧洞塑性问题

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定