Asphalt concrete core-wall rockfill dam is one of the main types of earth-rock dam.
沥青混凝土心墙堆石坝是土石坝的主要坝型之一。
The principle part of the dam which plays a supporting role is made of moraines and gravel and its middle position setting asphalt concrete core-wall plays an anti-seepage role.
大坝主体由堆石坝或砾石组成,起支撑作用,中间设置沥青混凝土心墙起防渗作用。
Meanwhile, in the superposition beat shearing force wall, the precast block and the core concrete part can work cooperatively.
叠合板式剪力墙中,预制板与核心混凝土部分能够较好地共同工作。
The main concrete cutting tools that are utilized include the wall saw, the flat saw, the core drill, and the wire saw.
混凝土切割工具,主要是利用包括看到墙上,单位锯核心钻、绳锯。
The high performance concrete for core wall of earth dam must be good workability, low early strength, high final strength, high seepage resistance, low elasticity modulus and high tensile strength.
黄壁庄水库副坝防渗心墙加固工程所需高性能混凝土,要求和易性好、早期强度低、后期强度高、抗渗性能好、低弹模和高抗拉强度。
This rolling construction technology of asphalt concrete core wall in Maopingxi earth and rockfill dam of TGP was the first application in China.
三峡茅坪溪防护土石坝沥青混凝土心墙骑缝碾压施工工艺为国内首创的施工方法。
The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.
尼尔基水利枢纽工程主坝结构形式为沥青混凝土心墙砂砾石坝。
The core wall of asphalt concrete with placement was applied to low clam.
浇筑式沥青混凝土心墙多用于低坝,易于施工。
In line with the applications of the technique of the plastic concrete core wall in Chishui Reservoir reinforcement engineering, the article analyzes the key points of this technique.
文章结合塑性混凝土心墙在赤水水库除险加固工程的应用,分析塑性混凝土心墙的施工技术要点。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
An introduction is made on the construction process of artificial hole pile including holing, wall protection, fabrication and installation of reinforcing cage, pile core concrete grouting etc.
介绍人工挖孔桩的成孔、护壁、钢筋笼制作和安装、桩芯混凝土浇灌等施工过程。
The curtain wall will enclose a composite concrete core with steel framing.
幕墙将包裹合成的带有钢铁框架的混凝土主核。
Analyzes the leakage from the asphalt concrete core wall on the river-bed section of Majiagou reservoir from the aspects of temperature, vertical current and current direction.
从温度、垂向流和流向三个方面分析马家沟水库大坝河床段沥青混凝土心墙的渗漏情况。
The practice indicates that the asphalt concrete ADAPTS to the core wall of earth-rock dam in the cold region.
实践表明,浇筑式沥青混凝土适用于寒冷地区土石坝的防渗心墙。
The unique feature of the large bay flexible residential building is that:every unit itself consists of a reinforced concrete tube-stairway core body-with its repective composite wall with openings.
带混凝土筒大开间砖混结构灵活住宅体系的特点是,每个单元有一个钢筋混凝土楼梯筒,分户横墙与外纵墙均采用组合砖墙砌体。
The construction of roller compacted asphalt concrete core wall and the transition lager and the cons...
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body goo…
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
Roller compacted asphalt concrete core wall is built by spreading hot-mixed asphalt concrete with a certain thickness and then shaping-rolled by vibratory roller.
碾压式沥青混凝土心墙,是将热拌后的沥青混合料按一定的厚度摊铺在铺筑部位上,然后用适当的振动碾碾压成型。
This paper describes a test study method of mat base material mix for asphalt concrete core wall.
介绍沥青混凝土心墙基座垫层料配合比的试验研究方法。
Results show that the displacement in horizontal direction and the maximum principal stress of core wall will increase to a larger extent if the creep effect of asphalt concrete is considered.
分析结果表明,考虑蠕变效应,心墙的水平变形与最大主应力将有较大的增加。
This paper reviews recent research advances of steel-concrete composite structural systems including steel-concrete composite frame structures and frame-core wall hybrid structures.
以钢-混凝土组合框架结构和框架-核心筒混合结构为对象,综述了在钢-混凝土组合结构体系方面的一些研究新进展。
This paper reviews recent research advances of steel-concrete composite structural systems including steel-concrete composite frame structures and frame-core wall hybrid structures.
以钢-混凝土组合框架结构和框架-核心筒混合结构为对象,综述了在钢-混凝土组合结构体系方面的一些研究新进展。
应用推荐