Through project example, the temperature monitoring of mass concrete and application of comprehensive temperature control measures in engineering construction of mass concrete were introduced.
通过工程实例,介绍了大体积混凝土的温度监测及综合温控措施在大体积混凝土工程施工中的应用。
Started from the analysis of gate concrete temperature control, the paper made a brief study on temperature control methods and construction control measures in the process of construction.
为解决这一难题,本文从水闸混凝土温度控制问题的分析入手,对水闸混凝土施工过程中的温控方法和施工控制措施进行了简要探究。
Therefore well controlling of difference in temperature and temperature strain are important measures on concrete cracking control.
因此,控制好内外温差和温度变形是防止大体积混凝土出现裂缝的重要方法。
Therefore, a series of technical measures are adopted in actual construction has taken for temperature control of concrete construction.
因此,在实际施工中采取了一系列技术措施对混凝土施工进行温度控制。
The approximate calculation methods to control the cracks in the top wall of brick and concrete structure due to temperature difference and the related precaution - ary measures are put forward.
提出了控制砖混结构墙顶温度裂缝的近似计算方法以及有关防治措施。
In this paper effective measures are supplied on how to control crevice in large concrete baseplate caused by big temperature changes when building.
为控制因温差导致的大体积混凝土基础底板裂缝,本文提出行之有效的应对措施。
The paper presents various temperature control measures taken in ground concrete placement at permanent lock of Three Gorges Project during summer construction of 1999 .
介绍了三峡工程永久船闸地面混凝土在1999年夏季施工中所进行的各种温控措施。
This paper briefly introduces the main results of temperature control measures and temperature super vision of mass concrete of main tower of Jingzhou Yangtze River Highway Bridge.
简要介绍了荆州长江公路大桥混凝土主塔大体积混凝土监控措施及温度温测主要结果;
Pipe cooling is one of the most temperature control measures of concrete of arch DAMS.
水管冷却是拱坝混凝土的主要温控措施之一。
During dam concrete construction, relevant temperature control measures are adopted in different seasons.
针对不同季节,大坝混凝土在施。
Temperature control measures for side wall concrete construction in the sixth lock head of the permanent navigation locks at the Three Gorges Project during hot season are briefly given in the paper.
简述了三峡工程永久船闸六闸首边墙混凝土高温季节施工的温控措施。
Temperature control measures for side wall concrete construction in the sixth lock head of the permanent navigation locks at the Three Gorges Project during hot season are briefly given in the paper.
简述了三峡工程永久船闸六闸首边墙混凝土高温季节施工的温控措施。