• Suppose that we wish to estimate the total cost to complete piping construction activities on a project.

    假定估算某项目直线管道铺设工程成本

    youdao

  • With a degree that qualified him to estimate the cost of construction projects, he is also contacting construction companies in Canada.

    专业使得他有资格估计建筑设施成本同时他也和加拿大建筑商联系。

    youdao

  • Have three-year college degree (or equivalent education level), at least 3 years experience in cost estimate and budget as well as experience in construction site.

    具有大专以上学历同等级别教育经历),工程造价专业方面有3以上工作经验以及工程现场结算工作经历。

    youdao

  • During the period of preliminary design and construction drawing design, the budget statement should be prepared respectively so as to optimize the cost estimate.

    初步设计施工图设计阶段分别编制初步设计概算书施工图设计预算书,进一步优化成本预算。

    youdao

  • During the period of preliminary design and construction drawing design, the budget statement should be prepared respectively so as to optimize the cost estimate.

    初步设计施工图设计阶段分别编制初步设计概算书施工图设计预算书,进一步优化成本预算。

    youdao