• For his part, he might spend his time on everything from a conceptual design to cost estimates to construction documents to phone calls with contractors.

    对于来说可能要花费他的时间一切概念设计成本估算施工文件承建商电话呼叫

    youdao

  • WAA was lead consultant for the development of the concept, research, coordination, overall and detail design, construction documents and resident supervision.

    WAA领头设计顾问,负责概念研究协调整体详细设计,施工文件和现场监督

    youdao

  • Limiting rules which may appear in building codes or in title documents which control the size, placement, materials, design or location of new construction.

    可能出现建造准则产权文件中的限制规则,对建筑大小安置材料设计或者地点进行控制

    youdao

  • The construction organization and design refer to the technical and economic documents during the landscape project construction.

    施工组织设计是园林工程建设过程中技术经济性文件

    youdao

  • The construction organization plan and the construction cost are the important components of the water-conservation and hydroelectric design documents.

    施工组织设计工程造价水利水电工程设计文件重要组成部分。

    youdao

  • Methods:According to the Quality Evaluation Questionnaire for the Construction and Design made by our work team, we evaluated the qualities of 1339 documents from 2006 to 2008.

    方法根据课题组拟定《建设项目施工设计预防性卫生审核文书质量调查表》对上海市某区卫生局卫生监督所2006~2008年1339份建设项目预防性卫生审核档案逐个进行评阅

    youdao

  • All documents and drawings for design and construction of the Vessel which shall be submitted to the Owner, shall be prepared in English.

    所有提交船东的有关本设计建造文档资料图纸均使用英文。

    youdao

  • Nuclear power project prophase file refers to the documents produced during the project - licensing, approving, bidding, surveying, design, and construction preparation before project kickoff.

    核电项目前期文件核电工程开工以前在立项审批招投标勘察设计以及工程准备过程中形成文件

    youdao

  • BA sed on approved Design Development the executive architect or general contractor will produce the Construction Documents.

    建筑师或者承包人已审定的初步设计的基础上编制施工图文件

    youdao

  • In case the Party a or other approval units would not approve the design documents or the construction of this Contract is suspended, the Party a should also pay the payable design charges.

    甲方其他审批单位设计文件审批或合同项目暂停缓建,甲方均支付应付设计费。

    youdao

  • Other documents as required by Regulations on Administration of Construction and Engineering Design Enterprise Qualifications.

    建设工程设计企业资质管理规定要求提供其他资料

    youdao

  • Other documents as required by Regulations on Administration of Construction and Engineering Design Enterprise Qualifications.

    建设工程设计企业资质管理规定要求提供其他资料

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定