In this paper author introduces the application of this article in road bidding, construction management, engineering schedule, engineering quality, engineering cost and contract management.
着重论述了本条款在公路投标、施工组织、工程进度、工程质量、工程费用、合同管理各个阶段中的应用。
The construction management plan to be optimized and executed to help the works completing on schedule with good quality and safety.
优化施工组织设计并组织实施以利工程能在优质、安全的前提下能如期完成。
As schedule and cost is managed synthetically in project, earned value concept played an important role in construction project management.
赢得值原理作为工程项目中进度与成本综合管理,对施工项目管理起着不可忽视的作用。
Strengthen construction management and extend use new management method can promote engineering schedule and shorten time of project and saving fund and reduce cost.
只有加强施工管理,推广使用新管理方法,才能促进工程进度,缩短工期,节约资金,降低造价。
This paper probes into the countermeasures for doing well the construction management from aspects of the schedule control, cost control, and quality control, etc.
从工程的进度控制、成本控制、质量控制方面探讨了搞好施工管理的对策。
Its thought that psychological health should be improved by means of the teaching schedule, management, the selected courses, social practice and the cultural construction on campus.
高校大学生健康心理素质的培养,一般认为,应从教育教学规划与管理、课程设置、社会实践与校园文化建设等几方面下功夫。
In the construction management system, its aims mainly at the cost, schedule and quality of these three aspects.
在建设项目管理体系中,其目标主要表现在费用、进度和质量这三方面。
Providing services required because of signIficant changes in the Project, including size, schedule, materials, method of bidding or construction contracting or construction management.
因工程的重大变化(包括工程规模、进度、材料、招标方法、或施工承包或施工管理等)的要求而提供的相应服务。
Therefore, in the management of modern construction projects, it is becoming an important work to control and manage the construction schedule.
因此,在现代施工项目管理中,对工程进度的控制和管理成为一项极为重要的工作。
A complete construction project management should both include schedule and control. The former is the basis of the latter, and the latter is the security of the former.
完整的进度管理既应有进度计划,又有进度控制,前者是后者的基础,后者是前者的保障。
In the premise of the high quality of engineering project, the optimization between the project cost and construction schedule determines the successful of a project management.
在保证工程项目质量的前提下,项目成本与进度的优化就成了项目管理成功与否的决定因素。
In the premise of the high quality of engineering project, the optimization between the project cost and construction schedule determines the successful of a project management.
在保证工程项目质量的前提下,项目成本与进度的优化就成了项目管理成功与否的决定因素。
应用推荐