According to the construction cost plan, cost program evaluation and time-cost optimization are used to control the project cost.
根据施工项目的成本计划,运用成本计划评审法和时间成本优化法对项目成本进行控制。
The cost control in the construction phase is the key whether the construction enterprises can effectively control the project cost.
建筑施工企业能否有效控制项目成本的关键是控制施工阶段的成本。
Thus, we will have a better way to control the project cost and lower the risk of contract management and improve the benefit of fixed assets also.
同时也将在设计管理、招投标管理、合同管理、施工管理领域管理水平的提高产生深远的意义。
This article analyses and compares the problems existing in the cost control of the early stage, and it discusses a solution to control the project cost effectively.
本文分析、比较了当前我们在住宅建设的前期造价控制阶段存在的问题,针对这些问题提出了相应的解决方法,为更好、有效地控制工程造价提出了意见和建议。
How to optimize the design in order to reduce or control the project cost was described, several measures to control costs in the design phase of rural highway construction were proposed.
阐述了如何优化设计以降低或控制工程造价,提出了农村公路建设中设计阶段控制造价的几点措施。
Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.
质量活动必须使成本和进度处于项目的控制之下,以满足CMM的精神。
The paper analyses the problems existing in cost control at design stage and presents the corresponding measures to realize the objective of project management.
分析目前设计阶段造价控制存在的问题,根据存在的问题提出相应的措施,以保证项目管理目标的实现。
In the process of contracting, these risks will produce a great influence on the project progress, its cost and quality control.
在工程承包过程中,这些风险因素都可能给工程进度、费用、质量的控制造成极大影响。
The cost control in the construction phase is the key for construction enterprises effectively control project cost control.
施工阶段的成本控制是施工企业能否有效进行项目成本控制的关键。
These problems could make the software project lose control on quality, plan and cost and make bad result at last.
这些问题将会使软件项目在质量、进度、成本等方面失去控制,最终导致失败。
Three controls were usually emphasized in the engineering project implementation process: quality control, progress control and cost control.
工程项目实施过程中通常强调三大控制:质量控制、工期控制、成本控制。
The engineering project is the construction enterprise effectiveness of operation source and the cost control center.
工程项目是施工企业经营效益的源头及成本控制的中心。
The key to effective control and management of construction project cost lies in ability to measure and analyze accurately the cost factors influenced.
施工项目成本的有效控制与管理,关键在于能对成本影响因素进行准确的计量与分析。
Therefore, the high-speed railway construction enterprises must carry out the project cost control in order to ensure economic efficiency.
因此,高速铁路施工企业必须进行项目成本控制,才能保证经济效益。
Below will from the project cost control system of project bidding and contract management aspects of some problems with this professional knowledge in this paper.
下面将从项目成本控制体系的项目投标和合同管理方面的一些问题结合本专业知识进行阐述。
Starting from the basic point of how to do well in cost control, the paper explores the general principles of project cost management and control.
本文就是从如何搞好成本控制的基准点出发,探讨项目中成本费用管理与控制的一般原则。
The paper introduced the principle of engineering project cost control, forecast of the cost, the effective way of reducing the cost and the determination of cost control goal.
介绍了工程项目成本控制的原则,成本的预测,降低成本的有效途径及成本控制目标的确定。
Project management is a main method to managing Architectural Engineering, project cost control is one of the "three main targets control" in Architectural Engineering project management.
项目管理是实施建筑工程管理的主要手段,项目成本控制又是建筑工程项目管理中“三大目标控制”之一。
The key of low cost strategy for a petroleum engineering project is to effectively control the project progress, its cost and quality.
石油工程项目实施低成本战略,关键是对项目的进度、成本与质量进行有效地控制。
Special points of the project cost of railway satellite communication are analyzed, and how to control the cost in various links of project implementation is discussed.
详细分析铁路卫星通信工程费用的特殊点,探讨了在项目实施的各个环节如何控制成本。
It is discussed how to control the cost of a project in its various stages from the beginning of design to the cheeking before acceptance.
论述了从初步设计到工程竣工验收各个阶段工程建设的造价控制。
How to control and manage the cost of development project is described briefly from the aspects of engineering design, project implementation.
文章从工程设计、项目实施等方面简单阐述了如何对开发项目进行成本控制和管理。
These are discussed in this paper on process, approaches and measures of how to control quota design by analyzing the present of cost control during the phase of housing project design.
本文分析了目前我国住宅项目设计阶段造价控制的现状,并就我国住宅项目限额设计实施控制的过程、途径和保障措施进行探讨。
Finally, the paper unifies examples, summarized cost control measures in practice, proposed analysis of the direction on how we can further strengthen the real estate development project cost control.
论文最后结合实例,总结了实践中的成本控制措施,对今后如何进一步加强房地产开发项目成本控制提出了方向性分析。
To improve the control level of cost project management is helpful to improve the rationality of project cost.
提高项目造价的控制水平的管理,有利于提高工程项目造价的合理性。
How to control the construction project cost reasonably for investors is discussed from four stages of the decision making, design, contracting, and construction.
从建设项目的决策、设计、发包、施工等四个阶段讨论投资方如何对建设项目造价进行合理控制。
Cost control during the design stage is essential for the overall cost control of the project.
设计阶段工程造价管理是控制工程项目总体造价的关键。
Combining purchase, plan, material and machinery management of Lidu Changjiang bridge, this paper presents the characteristic of cost control of the project.
本文结合李渡长江大桥施工过程中采购、方案及料机管理等方面的工作,阐述了项目成本控制方面的特点。
Construction equipment installation project cost control process, the key should be in the design process, construction process and settlement of the audit process for strict and effective control.
建筑设备安装工程造价的过程控制,关键应在设计过程、施工过程及结算审核过程中进行严格有效的控制。
Construction equipment installation project cost control process, the key should be in the design process, construction process and settlement of the audit process for strict and effective control.
建筑设备安装工程造价的过程控制,关键应在设计过程、施工过程及结算审核过程中进行严格有效的控制。