So why is the cost estimate so much higher than Wilson's?
那么为什么马科斯和卡巴约估算的费用比威尔逊的高出这么多呢?
Specific items in the detailed cost estimate become job cost elements.
详细成本估算中的具体项次成为工作成本要素。
The return is based on the cost estimate and the potential revenue estimates. 5.
收益是基于成本估计和潜在收入估计的。
Cost budgeting-allocating the overall cost estimate to individual work items.
费用预算-总费用分配到单个工作项目上。
Gregg promised to send us a revised cost estimate for the trip by the end of last week.
葛雷格曾答应在这礼拜之前给我们发来调整后的费用估算数字。
The budgeted cost is derived from the detailed cost estimate prepared at the start of the project.
预算本钱由项目初始阶段的具体成本估算得来。
And carries on the cost estimate, the budget and the control to the morning star company's ERP project.
并对晨星公司的ERP项目进行成本估算、预算及控制。
His cost estimate was way off base, far higher than warranted by current prices for labor and materials.
他的成本估计太离谱了,不合理地远远高于目前劳力和材料的价格。
You can now use the SQL outline again to see that the cost estimate is reduced just by doing this simple task.
现在您可以再次查看SQL大纲,您将看到,成本估计降低了,这仅仅是因为执行这个简单任务。
Generally, the accuracy of a cost estimate will reflect the information available at the time of estimation.
总的来说,估价的准确程度将反映估价时所获取的信息。
For materials in collective requirements, the existing cost estimates are transferred into the new cost estimate.
对集中需求的物料,已经存在的成本核算数据被传递到新的成本核算中去。
However, in order to get the best cost estimate, the optimizer needs the values that will be used when the query executes.
然而,为了获得最佳的开销评估值,优化器需要获得查询执行时使用的值。
The cost estimate for those SITEs would be delivered to OPERATOR within 5 business days following the actual SITE visit.
承包商必须在实地勘测站点后5个工作日内提交工程的成本估价给运营商。
Research on software support cost estimate model is important to the precision and efficiency of software cost estimate.
软件保障模型估算的研究对提高软件保障费用估算的精度和效率有重要意义。
This article uses the COCOMO II method, becomes the case to the domestic software development cost estimate aspect which may refer.
本文的意义在于使用COCOMOII方式,对海内的软件开发成本估算方面成为一个可参考的案例。');
First this thesis supplies that the accuracy of cost estimate and the level of mark-up are important in the bidding process by ana.
本文首先通过分析竞争性投标中标价的构成和影响中标的因素,指出了成本估价的准确性和标高金的水平在投标中的重要性。
In terms of the strategies of price, the outcome will be brought to light through the analysis of the cost estimate of commercial houses.
在价格策略方面,主要是通过对商品房的成本构成分析,制定出工农路九号住宅小区商品房的定价目标、定价方法、定价策略等价格策略。
Converting a final cost estimate into a project budget compatible with an organization's cost accounts is not always a straightforward task.
把最终的成本估算转化成与组织的成本报告兼容的项目预算并不是一项简单的工作。
Software cost estimate with the traditional experience function has the shortcoming, and applying CBR estimate method can make up these problems.
用传统的经验函数估算软件成本有很多局限性,采用基于范例库推理的估算方法可以很好地弥补其中的问题。
This staffing model (or "map" if the word "model" sounds too formal) will provide input to the overall cost estimate by establishing timing for the costs.
这个人员配备模型(如果“模型”这个词听起来太正式,可换成“图”)将通过对成本适时的评估提供所需的全部成本评估。
As the staff member gains in-depth insight into the impact of the database field length increase, he can give a better cost estimate for this modification.
通过深入了解增加数据库字段长度的影响,可以更准确地估计这一修改的成本。
The practice indicated that the cost management system of software project based on RUP could manage the cost estimate and management more successfully.
实践结果表明,基于RUP的软件项目成本管理系统是指导软件开发机构进行项目成本估算和管理的一个较为有效的工具。
A cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.
在项目开发过程中的某一特定阶段的成本估算就是造价工程师在现有数据基础上对未来成本的预测。
Moreover, the categories of cost accounts established within an organization may bear little resemblance to the quantities included in a final cost estimate.
此外,建立在组织内部的成本报告种类同详细的成本估算中的数量很少有相似之处。
Realistically, a budget accounting item for contingency allowance should be established whenever a contingency amount was included in the final cost estimate.
在实际操作当中,无论详细的成本估算中是否包括了意外事件,项目预算都应列支一笔应急储备金。
Other materials are carried as collective requirements. These materials are withdrawn from stock and the costs are taken from the current standard cost estimate.
有些物料作为集合的需求被传送,这些物料从库存提取,成本来自当前的标准成本评估。
Have three-year college degree (or equivalent education level), at least 3 years experience in cost estimate and budget as well as experience in construction site.
具有大专以上学历(或同等级别的教育经历),在工程造价专业方面有3年以上工作经验以及工程现场的预结算工作经历。
This paper describes the software project cost estimate model based on RUP. Based on the survey, a software project cost management system is designed and realized.
在对基于RUP的软件项目成本估算模型进行研究的基础上,本文设计并实现了基于RUP的软件项目成本管理系统。
Two alternative means will be provided for making an approximate structural cost estimate: one on a square foot of building basis, and another on volumes of structural materials used.
有两种可供选择的方法将用来进行结构造价的近似估价:其一是根据单位平方英尺建筑面积,另一种则是根据所用的结构材料体积进行估价。
Finally, with the problems being solved in the process of programming, I develop a suit of applications software for cost estimate of artillery weapon equipments based on users' demands.
最后,在解决了软件实现过程中所遇问题的基础上,开发了一套炮兵武器装备费用估算软件模块。