In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path" (CP).
本文主要介绍网络计划中模糊理论的运用及时间参数作为模糊变量的计算方法和模糊网络关键线路的确定。
When the durations of activities in a planning network are precisely known, Critical Path method has been proved to be a effective method to make planning.
当工程网络计划中活动持续时间为已知的确定值时,关键路径法被证明为是一个网络计划的有效方法。
Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.
基于对模糊网络计算方法的研究,提出了新的网络参数计算和关键线路判断方法。
The network planning technique is a kind of method formulating plans and project management execution. Critical path method (CPM) and Program Evaluation and Review Technique (PERT) are commonly used.
网络计划技术是一种制定计划和对项目进行管理的方法,最常用的即是关键线路法CPM和计划评审技术PERT。
Basic project planning, critical path, critical chain, or PERT analysis may mitigate such failings.
基本的项目计划、关键路程、重要链子,和计划评审技术分析也许会减低失败的几率。
Basic project planning, critical path, critical chain, or PERT analysis may mitigate such failings.
基本的项目计划、关键路程、重要链子,和计划评审技术分析也许会减低失败的几率。