For peasants, cut and fill are simultaneous and inseparable.
对于农民来说,填方和挖方是同时进行且不可分离的。
The upward horizontal cut and fill stoping method and the measures for safe mining are recommended.
推荐使用机械化上向水平分层充填采矿法,提出了安全回采措施。
Following the peasant model of equal cut and fill, our landscapes would be more energy efficient and easily constructed.
如果我们懂得像农民那样去填挖方、去造地形,我们的景观便能更具能效。
A cut and fill approach was used and the dirt removed for underground parking was used to make the mounds in the landscape.
利用开凿和装填的手段,把建造地下停车场时挖出的泥土用来作为景观中的小丘。
Be there for others during their times of need but know that you can, and should, cut loose people who fill your life with negativity and self-doubt. Positivity and negativity are infectious.
在别人需要的时候出现,而且知道你能够出现,你应该出现,远离那些带着否定和自我怀疑出现在你生活中的人,因为积极和消极都是很有感染力的。
And the distributors have no incentive to fill their shelves with cut-price alternatives.
而经销商也没有诱因去把自己展架上的产品换成便宜的。
Channel deposits consisting of sand silt and clay fill the valleys cut by a river system.
河道沉积由砂,粉沙和粘土组成,充填于河流切割的河谷之中。
Scale to fill (cropped) will draw your image full screen, and cut the parts which extend outside the screen.
自适应填充(裁切不正的)满屏显示,屏幕外的部分将不显示…
Channel deposits, consisting of sand, silt and clay, fill the valleys cut by a river system.
河道沉积由砂,粉沙和粘土组成,充填于河流切割的河谷之中。
By the Tang Dynasty, shadow puppets and an increasingly sophisticated engraved cut and wrap-color fill color, talk about history as a pass through.
到了唐代,皮影剪刻日益精致,敷色填彩,用作讲史传经。
Lock needle should be in all damask, fill needle and the segment that allow why to cut line ending to go up, if change color orEmbroiderThe put together of the design is nodded.
锁针应该在所有的缎条,填针以及任何以剪线结尾的片断上,如换色或者绣花设计的综点。
Main function GH-DXD series automatic filling and packing machines can automatically measure, make bags, fill, seal, cut, print codes and make easy tearing notches.
功能概述GH - DXD系列包装机,可自动完成计量、制袋、填充、封合、切断、打印生产日期、切易撕口等工序。
The practice cf mining room first and then pillars by overhand cut and cemented fill is widely used in China, but the condition for pillars recovery in later period is normally worse.
先房后柱的上向分层胶结充填法在我国应用较为广泛,但矿柱后期回采条件较差。
To overcome the difficulty of unstability of orebody and surrounding rock, the test of flat-back cut-and-fill drift mining is carried out.
针对凡口铅锌矿狮岭顶板矿体和围岩极不稳固的牲,进行了机械化上向进路分层充填采矿工艺的试验研究。
By means of initial strain method, the plastic problem in cut-and-fill mining is solved by integration equation.
本文采用了初应变法提出非线性问题的边界积分方程并指出了在充填采矿中的应用。
Excellent results were obtained in mining of pillars using tailings in horizontal cut-and-fill.
用尾砂分层充填法回采矿柱,取得了很好的经济效果。
The method discussed in this paper refers to the cut and consolidated fill method in which drilling is done by jumbo, broken ore moved by LHD unit and the filler transported by pipeline.
该采矿法指用台车凿岩、铲运机出矿和管道输送充填料的胶结充填采矿法。
I used the polygonal tool to select the cut areas and used the paint bucket tool to fill the selections with red color.
我用多边形套索工具来选出剖切面,然后使用油漆桶工具将选区填充为红色。
Subgrade earthwork and rockwork shall include: fill subgrade earthwork, cut subgrade, special subgrade treatment and other relevant activities.
路基土石方工程包括:填方路基、挖方路基和特殊路基处理及其有关的作业。
And he put the wood in order, and cut the bullock in pieces, and laid him on the wood, and said, Fill four barrels with water, and pour it on the burnt sacrifice, and on the wood.
又在坛上摆好了柴,把牛犊切成块子放在柴上,对众人说,你们用四个桶盛满水,倒在燔祭和柴上。
To improve the accuracy of cut & fill earthwork volume calculation, triangulate irregular network(TIN)was adopted to build the design model and real model.
为了提高填挖方计算精度,采用构建不规则三角网法,构建设计模型与现实模型。
To ensure that the rooms are the correct height, one must turn on the cut section and look for the room fill or set the desired height in the properties.
为了保证这一点,画图者必须要打开剖面检查房间填充,或者在属性中设置想要的房屋高度。
At present, cut-and-fill method is adopted in a growing number of mines. However, it is quite common that stopes roofs are unable to be tight by pipeline transport in filling.
目前,使用充填采矿法的矿山日益增多,管道输送充填不接顶现象普遍存在。
A new cut-fill method is adopted in the design of access road of Miaojiaba hydropower project by directly backfilling on the subgrade alluvium, and has probed a set of effective design method.
苗家坝水电站对外公路在淤积层路段设计中采用了坡脚换填抗剪、在淤积层上直接回填路基的新方法,摸索出一套有效的设计方法。
A new cut-fill method is adopted in the design of access road of Miaojiaba hydropower project by directly backfilling on the subgrade alluvium, and has probed a set of effective design method.
苗家坝水电站对外公路在淤积层路段设计中采用了坡脚换填抗剪、在淤积层上直接回填路基的新方法,摸索出一套有效的设计方法。
应用推荐