Harbin sifangtai bridge is a cable-stayed bridge whose girder is composed by steel i-beam above and concrete deck slab below.
作为叠合梁斜拉桥,四方台大桥的主梁由下部的工字钢和上部的混凝土行车道板组合而成。
A comparison of steel deck weights indicates that the cable-stayed bridge again fills the void between the continuous girder and suspension Bridges.
以上钢桥面重量的比较指出,斜拉桥介于连续梁和悬索桥之间。
Based on the model test and analysis of 3D limited units, this paper studies the internal force of lengthways stiffened bridge deck slab of double-triangle side box girder.
论文通过模型试验和空间有限元分析对具有双三角边箱主梁的纵向加劲桥面板的内力情况进行研究。
In the paper, one of the finite element analytical models for spatial vibration of the train and deck steel plate girder bridge system is presented.
以结构力学为基础,利用加固前对钢板梁桥测得的横向位移,提出了一种通过反算出列车等效横向摇摆力来计算加固后钢板梁桥的横向位移的方法。
In the paper, the 3-dimension finite element model for bridge deck continuous simply-supported girder is established and model analysis is carried out with ANSYS.
本文以高架桥常见的结构形式桥面连续简支梁结构为例,建立三维有限元模型,进行了模态分析并与试验结果进行对比分析。
The gait-model bridge girder erection machine mainly applied to the erection of long-span, large-tonnage and double amplitude bridge deck concrete full-span box girders.
本架桥机主要应用于大跨度、大吨位、双幅桥梁架设中混凝土整孔箱梁的架设。
The gait-model bridge girder erection machine mainly applied to the erection of long-span, large-tonnage and double amplitude bridge deck concrete full-span box girders.
本架桥机主要应用于大跨度、大吨位、双幅桥梁架设中混凝土整孔箱梁的架设。
应用推荐