• The paper introduced the principle of engineering project cost control, forecast of the cost, the effective way of reducing the cost and the determination of cost control goal.

    介绍工程项目成本控制原则,成本的预测降低成本有效途径成本控制目标确定

    youdao

  • In this paper, first architectural engineering project cost control influential factors were analyzed, and then puts forward construction engineering project cost control optimization strategy.

    本文首先建筑工程项目成本控制影响因素进行了分析,然后提出建筑工程项目成本控制优化策略。

    youdao

  • Three controls were usually emphasized in the engineering project implementation process: quality control, progress control and cost control.

    工程项目实施过程通常强调三大控制质量控制工期控制、成本控制。

    youdao

  • They are designed to provide advisory services, project cost control, engineering and equipment, material bidding. project management consultancy services.

    服务项目提供设计咨询工程成本控制工程设备材料招投标,工程项目管理等顾问服务。

    youdao

  • The engineering project is the construction enterprise effectiveness of operation source and the cost control center.

    工程项目施工企业经营效益源头成本控制中心

    youdao

  • This paper discusses the cost control methods of highway engineering, and analyzed the significance of the project cost management and specific measures of cost management.

    本文论述公路工程成本控制方法着重分析了工程成本管理意义成本管理的具体措施

    youdao

  • How to control and manage the cost of development project is described briefly from the aspects of engineering design, project implementation.

    文章工程设计项目实施等方面简单阐述了如何开发项目进行成本控制管理

    youdao

  • The key of low cost strategy for a petroleum engineering project is to effectively control the project progress, its cost and quality.

    石油工程项目实施成本战略关键项目进度、成本质量进行有效地控制

    youdao

  • Through the work of economic appraisal before the construction of a engineering project, the paper submits the effective methods to control construction cost.

    通过工程项目施工经济评估工作提出控制工程成本有效方法

    youdao

  • Project management is a main method to managing Architectural Engineering, project cost control is one of the "three main targets control" in Architectural Engineering project management.

    项目管理实施建筑工程管理的主要手段,项目成本控制又是建筑工程项目管理目标控制”之一

    youdao

  • Strengthening the cost management and control of engineering project is an inevitable path of increasing the competitive power of the construction enterprise.

    加强工程项目成本管理控制增强施工企业竞争力必然途径

    youdao

  • How to control the engineering project cost to maximize profit is what is earnestly cared of by and one of the research topics of the operators.

    如何控制工程项目成本争取利润最大化,经营者认真关心研究课题

    youdao

  • This article, through analyzing the importance of engineering cost control, brings forth a couple of measures to control project cost combined with the work experience of the author.

    此文通过分析工程项目成本控制重要性结合工作实践提出控制项目成本的措施

    youdao

  • The control of the construction cost of the construction project is a complex system engineering that penetrates the whole course of the construction of the project.

    建设项目工程造价控制一个贯穿项目建设全过程复杂系统工程

    youdao

  • Abstract: Project construction cost control is an important content of engineering construction management, but also an important way to achieve the business objectives of the construction enterprise.

    摘要工程施工成本控制工程施工管理重要内容也是达成施工企业经营目标的重要途径

    youdao

  • This paper studies in depth the cost control of municipal engineering project by analyzing present questions.

    通过分析目前市政工程项目成本控制存在问题市政工程成本控制进行了深入探讨

    youdao

  • The paper exhibits the significance of whole-process cost control of engineering project and the control methods in each phase.

    介绍工程项目全过程造价控制意义阶段控制方法

    youdao

  • Engineering Follow-up auditing, as a new method, has received good results in the project control, but also greatly increases the audit cost.

    工程跟踪审计新生方法工程项目控制收到很好的效果但是大大的增加审计成本。

    youdao

  • This paper discusses the construction engineering project construction cost control the meaning, objects and contents, puts forward the project construction cost control measures.

    本文探讨了建筑工程施工阶段造价控制含义对象内容提出了施工阶段造价控制的措施

    youdao

  • Analyses some problems existed in project construction, such as, lack idea of control engineering cost, deficient management system in design stage, many visas made in the field, etc.

    剖析了目前工程建设普遍存在缺乏系统控制工程造价观念设计阶段管理制度不完善问题

    youdao

  • Engineering examples show that the calculated model is a strong operational, and it will help to quickly determine and effectively control the cost of a large earthwork project.

    工程实例分析表明计算模型具有强的可操作性有助于快速确定有效控制大型土石方工程工程造价

    youdao

  • While the quality of engineering cost control effect is often influenced by many factors, the project, design, construction, completion and so on each process would affect the level of the cost of.

    工程造价制约效果好坏受到多方面因素影响立项设计施工竣工每个过程都会影响到造价的高低

    youdao

  • Construction project cost control is to the construction project all relevant project schedule, quality cost cost control, to ensure the construction engineering reasonable, smooth.

    建筑工程成本控制建筑工程一切有关工程进度质量花费成本进行控制,保证建筑工程合理顺畅的进行。

    youdao

  • Leading project team to realize the order fulfillment (engineering), Control project's quality in time, cost and products' performance.

    领导项目团队完成订单执行(设计),控制项目成本执行时间产品质量

    youdao

  • Abstract: Project cost control runs through the whole process of engineering construction, the completion phase is a key of control of cost.

    摘要]工程竣工阶段工程建设最后阶段又是工程最终造价的形成阶段,竣工结算审核是造价控制关键

    youdao

  • To do well in cost control of municipal engineering project and to increase incomes while cutting down expense, It is the most important section in the course of project operation.

    搞好成本控制,达到增收节支目的项目经营活动最为重要环节

    youdao

  • From the cause of project change, this paper analyses the influences of project change over municipal engineering cost and how to control the project change of municipal engineering well.

    工程变更产生原因出发,分析了工程变更市政工程造价影响,提出了加强市政工程变更有效控制的措施。

    youdao

  • Then the key of engineering cost control is obtained-clarity of project range and good or bad of design quality.

    从而得出工程造价制约重点建设范围的明晰设计质量的高低。

    youdao

  • Then the key of engineering cost control is obtained-clarity of project range and good or bad of design quality.

    从而得出工程造价制约重点建设范围的明晰设计质量的高低。

    youdao