Emerson was also responsible for final acceptance testing of all products and systems, control system configuration, training, and other on-site services.
艾默生还负责所有产品和系统,控制系统配置,培训及其它现场服务的最终验收测试。
Supervise commissioning of instrumentation and final loop acceptance testing.
监管仪表调试以及仪表控制回路最终测试验收。
Testing the new infrastructure, both one unit at a time and all systems together. This is followed by a final "acceptance test, " run by the customer.
验收测试(也被称为功能测试)是由客户指定来测试整个系统是否完成既定功能。
Final assembly began in early 2011 with acceptance testing expected to occur mid-year. Flight testing is scheduled to begin on AF-1 test aircraft late in 2012.
最后组装已于2011年初展开,预计在年中进行兼容性方面的测试,飞行试验计划于2012年底在AF - 1试验机上完成。
Final assembly began in early 2011 with acceptance testing expected to occur mid-year. Flight testing is scheduled to begin on AF-1 test aircraft late in 2012.
最后组装已于2011年初展开,预计在年中进行兼容性方面的测试,飞行试验计划于2012年底在AF - 1试验机上完成。
应用推荐