We should gradually increase the pressure of the compressor and step into the full load operation.
我们应该逐渐的增加压缩机的压力,并逐步投入满负荷运行。
Rotary compressor is most suitable for close to full load operation conditions of the compressor compressed air system.
旋转式压缩机最适用于接近压缩机满负荷工况下运行的压缩空气系统。
The new car in the running in period is often full load operation, the load is too heavy, will cause the engine and gearbox load increase.
新车在磨合期期间常常满载运转,则归于负荷过重,会致使发动机及变速箱的负荷增大。
Research indicates that under full load operation of the reservoir, large local tensile stress will be produced at the dam heel and the outlet and inlet of the power penstock.
研究表明,当水库满载运行时,坝踵处产生较大局部拉应力;管道进出口也出现较大局部拉应力。
Therefore, air compressor operation, in addition to saving energy from a full, the energy consumption of the lower than input, and in part load and load without also want to energy conservation.
因此,空压机要运行节能,除了满载时,输入的能耗比要低,而且在部分负载和无负载时也要节能。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
In the early years of introduction of FGD technology, a spare absorber was included to allow full-load operation with one absorber out of service.
在引进FGD技术的早年,一种多余的吸收剂被包括退出运行用一种吸收剂给充分负荷运行。
Because the water balance production link is not recognized and regarded fully, long - term full load or even overload operation of coal water treatment plant are caused in production.
实际生产中,由于水平衡的生产环节未被充分认识和重视,导致生产中出现剩余氨水处理装置长期满负荷甚至超负荷运行的情况。
For a thermal power generating set, the automatic adjustment of water supply during operation under low load is always the bottleneck for the realization of full-scale water supply automatic control.
火力发电机组低负荷运行阶段的给水自动调节一直是实现全程给水自动控制的一个难点。
This paper introduces the experimental results of two snubber circuits for the full bridge switch circuit constituted by MOSFETs in case of the inductive load and large current operation.
介绍由MOSFET管构成的全桥开关电路在感性负载下大电流工作时两种吸收回路的实验研究结果。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
C设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
The ethylene plant of Jilin Chemical Industry CO. Ltd. was expanded in 2005 and put into full-load operation in 2006. The plant was also tested at full load.
中国石油吉林石化公司聚乙烯厂乙烯装置于2005年进行了扩能改造,2006年实现满负荷生产,并在满负荷情况下进行了装置标定。
The ethylene plant of Jilin Chemical Industry CO. Ltd. was expanded in 2005 and put into full-load operation in 2006. The plant was also tested at full load.
中国石油吉林石化公司聚乙烯厂乙烯装置于2005年进行了扩能改造,2006年实现满负荷生产,并在满负荷情况下进行了装置标定。
应用推荐