• It is difficult to build a dam in the sea, and the cost is very high.

    海里建水坝十分困难,成本也很高。

    youdao

  • Where damage has been identified, it has been cracking high in the dam and where additional features such as curbs, railings, gates, or guard or control houses are located.

    大坝确认收到破坏的部位,大都是在较高部位出现裂缝那里特点是附设有连接装置,护栏,泄水闸门警卫控制室等。

    youdao

  • The remaining portion of the dam adjacent to the damaged area also experienced high accelerations and separated from its foundation bedrock.

    大坝受损位置相邻其他部分同样受到加速冲击脱离了地基岩体。

    youdao

  • The dam wall is 870 ft. (265 m) high - taller than the Hoover dam - and when completed, the dam formed a reservoir 47 miles (75 km) long that completely submerged the old town of Tehri.

    大坝870英尺(265)——弗大坝高——竣工以后大坝形成了一个长达47英里(75千米)蓄水池,完全的特城镇完全陷入水中

    youdao

  • It was theorized with a high degree of probability that the change in period was due to the nonlinearity of the hydrodynamic pressure acting on the upstream face of the dam.

    推论最大可能性时间段非线性水压作用于坝体上游面所造成差别。

    youdao

  • This can be attributed, in part, to the fact that any cracking caused by the earthquake has mainly been horizontal and located high in the dam together with the reservoir not being full in many cases.

    是因为地震引起裂缝主要水平方向的,而且位于大坝的高处,水库一般不是量蓄水。

    youdao

  • The authors determined that Miyatoko Dam (see Figure 10), a 48m (157ft) high RCC dam was located approximately 13km (8 miles) north of Sendai.

    作者肯定地48的滚筒实压混凝土宫北大坝10大约在千代以北13公里

    youdao

  • Two other concrete gravity DAMS, the 73.5m (341ft) high Sugesawa dam and the 14m (46ft) high Uh DAMS were also located close to the earthquake epicenter.

    另外混凝土火力大坝,73.5大坝14米高的乌赫大坝位于震中附近

    youdao

  • Kasho, a 46.4m (152ft) high concrete gravity dam was shaken by the 6 October 2000 Western Tottori Earthquake (M 7.3) in Japan. The epicenter of the earthquake was about 3km (1.9 miles) from the dam.

    家所大坝是一46.4混凝土重力坝2000年106日受到日本西鸟取县7.4级地震的影响,震中离大坝3公里

    youdao

  • According to Rees, this recycled water arrangement, combined with the desalination plant, will ensure the city’s dam levels, which are currently just below 60%, will remain high.

    Rees说,这个再生水厂海水淡化长一起配置保证悉尼市的大坝储水量。

    youdao

  • They were formed in the 1990s by diverting water from lake Nasser, an artificial lake formed behind the Aswan High Dam on the river Nile.

    它们由于1990年代纳赛尔湖调水而形成的,是尼罗河阿斯旺大坝后面形成的人工湖

    youdao

  • The 156-meter-high Zipingpu Dam began to fill in December 2004, and within 2 years the water level had risen to 120 meters.

    高达156紫坪铺大坝于2004年12月份开始蓄水,年内水位已经到了120米。

    youdao

  • The first new design was by Alexander Gorlov, a Russian civil engineer who worked on the Aswan High Dam in Egypt.

    第一设计俄罗斯土木工程师亚历山大.佐罗夫完成的,他先埃及阿斯旺大坝工作后来移居到美国

    youdao

  • There is only one way to appreciate the scale of Egypt's monumental Aswan High Dam, and that is by standing directly on top of it.

    欣赏阿斯旺大坝壮美只有一个办法就是登上坝顶

    youdao

  • Thirty years later Gamal Abdel Nasser had to make a new treaty with Sudan in order to build the Aswan high dam.

    30年后纳赛尔不得不苏丹签订条约建立阿斯旺高坝。

    youdao

  • Her hosts held a festive celebration, then showed her the dam, an eight-foot-high sand-and-concrete structure that traps and filters water so that it's available and drinkable year-round.

    接待的主人举行了节日庆典然后,带她看水坝——英尺高混凝土结构,圈住过滤能够全年供应的饮用水

    youdao

  • 37a section of Lake Nasser in Egypt, a massive reservoir behind the Aswan High Dam on the Nile River, seen from the International Space Station in January of 2010.

    2010年1月份国际空间站上拍摄到埃及纳赛尔湖,这座尼罗河阿斯旺大坝大型水库

    youdao

  • Furthermore, model test of Xiluodu's high arch dam is studied and the. Result of stress and displacement is presented in this paper.

    此外,本文溪洛拱坝进行应力模型试验研究,给出了试验得到应力、变位结果

    youdao

  • It is indicated that the dynamic amplification of abutment rock body and dam-water-foundation interaction should be considered in the aseismatic stability analysis for high arch dam abutment.

    指出拱坝稳定分析考虑坝肩岩体动力放大-地基-库水的动力相互作用,算例表明所提方法的实用价值。

    youdao

  • Once the great important structure, such as high building, high dam undergo destroyed, the effect will be quite serious.

    高层结构拱坝重大建筑结构一旦遭受破坏后果相当严重

    youdao

  • Basic theory of nonlinear FEM analysis and its realization in ANSYS were studied. Accomplish stability analysis of high arch dam abutment based on nonlinear FEM analysis.

    因此对大型结构分析软件ANSYS三维非线性计算功能进行了深入研究,此基础完成了基于非线性有限单元拱坝坝肩稳定计算分析。

    youdao

  • The high Dam at Aswan was completed in 1970.

    阿斯旺的高坝于1970年完工的。

    youdao

  • Three of the biggest man-made projects in the world are the Great Wall of China, the Pyramids of Egypt and the Aswan High Dam, which is also in Egypt.

    世界上最大三项人造工程中国长城埃及金字塔阿斯旺高坝,埃及。

    youdao

  • Three of the biggest man-made projects in the world are the Great Wall of China, the Pyramids of Egypt and the Aswan High Dam, which is also in Egypt.

    世界上最大三项人造工程中国长城埃及金字塔阿斯旺高坝,埃及。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定