• The high Dam at Aswan was completed in 1970.

    阿斯旺的高坝于1970年完工的。

    youdao

  • The Jiangya dam is a high dam with RCC overall section.

    大坝全断面碾压混凝土(RCC高坝

    youdao

  • Egypt′s leadership in the Arab world was cemented by the Aswan High Dam.

    埃及阿拉伯世界领导地位建造阿斯旺大坝巩固

    youdao

  • After 11 years of construction, the Aswan High Dam in Egypt is completed.

    历经11修建后,埃及阿斯旺水坝竣工完成。

    youdao

  • 1970 - After 11 years of construction, the Aswan High Dam in Egypt is completed.

    1970今天,历经11修建埃及阿斯旺水坝竣工完成。

    youdao

  • Mayantong Hydropower Station will be exploited by taking high dam and diversion way.

    岩洞水电站采取高坝引水开发

    youdao

  • For the RCC high dam embedding high strength polyethylene cooling water pipe is studied.

    RCC高坝埋设强度聚乙烯冷却水管技术进行了研究。

    youdao

  • Thirty years later Gamal Abdel Nasser had to make a new treaty with Sudan in order to build the Aswan high dam.

    30年后纳赛尔不得不苏丹签订条约建立阿斯旺高坝。

    youdao

  • The first new design was by Alexander Gorlov, a Russian civil engineer who worked on the Aswan High Dam in Egypt.

    第一设计俄罗斯土木工程师亚历山大.佐罗夫完成的,他先埃及阿斯旺大坝工作后来移居到美国

    youdao

  • You can also visit the Aswan High Dam and the water it collects in Lake Nasser, the largest man-made lake in the world.

    可以游览阿斯旺大坝由此而形成塞尔世界最大人工湖

    youdao

  • Once the great important structure, such as high building, high dam undergo destroyed, the effect will be quite serious.

    高层结构拱坝重大建筑结构一旦遭受破坏后果相当严重

    youdao

  • Comparing with the large projects in China, the enlightenment given by the Aswan High Dam is illustrated by the authors.

    结合我国大型水利工程建设,阐述阿斯旺大坝我们启示

    youdao

  • The fluctuating pressure in joints of the bed rock may be a main factor to destroy the bed rock lower reach of a high dam.

    高坝下游基岩缝隙水流压力脉动可能造成基础破坏的一个基本因素

    youdao

  • There is only one way to appreciate the scale of Egypt's monumental Aswan High Dam, and that is by standing directly on top of it.

    欣赏阿斯旺大坝壮美只有一个办法就是登上坝顶

    youdao

  • They were formed in the 1990s by diverting water from lake Nasser, an artificial lake formed behind the Aswan High Dam on the river Nile.

    它们由于1990年代纳赛尔湖调水而形成的,是尼罗河阿斯旺大坝后面形成的人工湖

    youdao

  • On these basis and combined with reality, several technical measures for safely and highly efficient running of high dam are put forward.

    基础结合实际提出了针对该尾矿高坝安全高效运行几点技术措施

    youdao

  • Simulation of hydraulic fracturing of rock mass is an important issue in the construction design of high dam and deep-lying tunnel and so on.

    岩体水力劈裂模拟高坝、深隧洞工程施工设计中的重要问题

    youdao

  • Especially in high dam project with high seepage and pore water pressure, the degradation of material properties of concrete affects more evidently.

    特别是渗透孔隙压力作用下,混凝土材料性能劣化现象明显,严重影响工程安全性能。

    youdao

  • Three of the biggest man-made projects in the world are the Great Wall of China, the Pyramids of Egypt and the Aswan High Dam, which is also in Egypt.

    世界上最大三项人造工程中国长城埃及金字塔阿斯旺高坝,埃及。

    youdao

  • Three of the biggest man-made projects in the world are the Great Wall of China, the Pyramids of Egypt and the Aswan High Dam, which is also in Egypt.

    世界上三个最大人造工程,它们中国长城埃及金字塔阿斯旺高坝,后者也是埃及境内。

    youdao

  • 37a section of Lake Nasser in Egypt, a massive reservoir behind the Aswan High Dam on the Nile River, seen from the International Space Station in January of 2010.

    2010年1月份国际空间站上拍摄到埃及纳赛尔湖,这座尼罗河阿斯旺大坝大型水库

    youdao

  • "Before they started the High Dam 25 years ago," he said, "the Nile mud had a lot of food in it, and so the sardines gathered near the mouth of the river to feed."

    二十五年前修建高坝之前尼罗河泥沙里很多的东西,所以沙丁鱼就聚集在河口找食吃。”

    youdao

  • It is difficult to build a dam in the sea, and the cost is very high.

    海里建水坝十分困难,成本也很高。

    youdao

  • Where damage has been identified, it has been cracking high in the dam and where additional features such as curbs, railings, gates, or guard or control houses are located.

    大坝确认收到破坏的部位,大都是在较高部位出现裂缝那里特点是附设有连接装置,护栏,泄水闸门警卫控制室等。

    youdao

  • The remaining portion of the dam adjacent to the damaged area also experienced high accelerations and separated from its foundation bedrock.

    大坝受损位置相邻其他部分同样受到加速冲击脱离了地基岩体。

    youdao

  • The dam wall is 870 ft. (265 m) high - taller than the Hoover dam - and when completed, the dam formed a reservoir 47 miles (75 km) long that completely submerged the old town of Tehri.

    大坝870英尺(265)——弗大坝高——竣工以后大坝形成了一个长达47英里(75千米)蓄水池,完全的特城镇完全陷入水中

    youdao

  • It was theorized with a high degree of probability that the change in period was due to the nonlinearity of the hydrodynamic pressure acting on the upstream face of the dam.

    推论最大可能性时间段非线性水压作用于坝体上游面所造成差别。

    youdao

  • It was theorized with a high degree of probability that the change in period was due to the nonlinearity of the hydrodynamic pressure acting on the upstream face of the dam.

    推论最大可能性时间段非线性水压作用于坝体上游面所造成差别。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定