In 10mw High Temperature Gas-cooled reactor (HTR-10), the wear of graphite components generates the graphite dust to influence the normal working of the reactor.
在10MW高温气冷堆(HTR - 10)中,由于石墨构件的磨损会产生石墨粉尘,将影响反应堆的正常运行。
The paper presents the thermocouple penetration assemblies of 10mw high temperature gas cooled reactor (HTR - 10).
介绍了10MW高温气冷实验堆反应堆压力容器热电偶贯穿件。
Most High Temperature Gas-Cooled Reactor (HTR) systems are significantly under - moderated for economic reasons, so that accidental water or steam ingress.
由于经济上的原因,大多数高温气冷堆(HTR)系统都是慢化不充分的。
Advanced digital distributed computer system (termed DCS) is adopted in 10mw High Temperature Gas cooled test Reactor (termed HTR 10).
MW高温气冷实验堆(HTR - 10)的仪表与控制系统采用了先进的数字化分布式计算机控制系统(DCS)。
The article discusses the key issues which factor into the conceptualization of the gas turbine cycle to be coupled to the 10mw high temperature gas cooled test reactor (HTR 10).
讨论了10MW高温气冷实验堆(HTR 10)气体透平总体方案设计中应考虑的主要因素。
Thermodynamic considerations, configurations and construction, material selection and mechanical design of steam Generator (SG) in 10MW High Temperature Gas Cooled Test Reactor (HTR 10) are described.
描述了HTR10蒸汽发生器的结构设计,热工水力学特性,材料选择和力学分析等。
The essential principle and implementation of the bi directional detector for Fuel Handling System (FHS) in 10MW High Temperature gas cooled Reactor (HTR 10) are presented.
简单介绍了10MW高温气冷堆(HTR-10)电力系统的设计特点,并用故障树法对HTR-10交流安全母线供电的可靠性进行了定量的理论分析。
Both the primary helium circulator for high-temperature gas-cooled reactor (HTR) and the primary pump for the pressurized-water reactor are the key components in the reactor primary loop.
高温气冷堆主氦风机与压水堆主泵一样,均为反应堆一回路的关键设备。
The 10 MW high temperature gas cooled reactor (HTR 10) reached critical in the end of 2000 in China.
MW高温气冷实验堆(HTR-10 )于2 0 0 0年底在中国建成并实现临界,是一项重大的科研成果。
The 10 MW high temperature gas cooled reactor (HTR 10) reached critical in the end of 2000 in China.
MW高温气冷实验堆(HTR-10 )于2 0 0 0年底在中国建成并实现临界,是一项重大的科研成果。