• When the earthquake happens, seismic horizontal force will transfer into pier through energy dissipation device.

    地震发生后,梁体地震水平通过减震装置桥墩

    youdao

  • The numerical results reveal that a great horizontal force acting on the aqueduct body may occurred during strong earthquake. This action must be considered in seismic resistance design.

    计算表明强震流体槽身可能会产生很大横向水平,建议抗震设计时考虑一作用因素。

    youdao

  • The numerical results reveal that a great horizontal force acting on the aqueduct body may occurred during strong earthquake. This action must be considered in seismic resistance design.

    计算表明强震流体槽身可能会产生很大横向水平,建议抗震设计时考虑一作用因素。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定