It can be seen that the initial maximum pore water pressure takes place in the lower soil due to the load transformation from pile cap to soil.
研究结果表明,打桩后桩体所受荷载向下传递,地基中的初始最大孔隙水压力出现在桩端以下土层。
Arbitrary initial pore-water pressure distributions and flux boundary conditions are considered in the analytical solution.
此解析解考虑了任意初始的孔隙水压力分布和流量边界条件。
Arbitrary initial pore-water pressure distributions and flux boundary conditions are considered in the analytical solution.
此解析解考虑了任意初始的孔隙水压力分布和流量边界条件。
应用推荐