Lean construction is a new project management model that maximizes the value for the client and minimizes the waste.
精益建设是一种新型的对顾客实现价值最大化、浪费最小化的施工管理模式。
At first this paper introduces to carry out the premise of lean construction, the base, the planning, control systems.
首先介绍了推行精益建设的前提、精益建设的基础、精益建设的计划与控制体系。
Afterwards, to the particularity of lean construction the author introduces a new control system named last planner system.
随后,作者针对精益建造的特殊性,引进了一种新的计划控制体系——最后计划者体系。
An alternative perspective is developed that considers the diffusion of lean construction across contested pluralistic arenas.
本文提出了一种不同的看法,它把精细建筑的普及看作是在多元化的竞争舞台上进行的。
At last, practicable main points of lean construction are brought up on the basis of actual condition in architecture of China.
最后根据我国建筑业国情,提出了精益建设的推行要点。
Abstract: In this paper, a new conceptual framework is put forward based on lean construction theoretics and reducing wastes in construction quality control.
在精益建造理论的基础上,从减少施工质量管理工作中浪费的角度出发,提出了一个新的质量控制概念框架。
Pisa, the Tower was built under Romanesque style and it started to lean from its construction; it's a symbol of Italy and its attractions.
意大利有数不清的游览胜地,不得不提的便是比萨的比萨斜塔,这座具有罗马风格的建筑从建成开始倾斜,是意大利的一个标志性建筑。
This paper USES lean thinking to optimize process management of sustainable construction, and further studies continuous improvement of lean process.
运用精益建造的思想对可持续性建筑的流程管理进行优化,深入精益流程持续改进的研究。
The mini rotary construction can been easily adopted in Lean system production line, which speed up the procedure time, achieves higher productivity.
迷你型旋转结构可直接纳入生产线中形成精益生产线,极大地加速了生产流程对接,使效率翻倍。
The mini rotary construction can been easily adopted in Lean system production line, which speed up the procedure time, achieves higher productivity.
迷你型旋转结构可直接纳入生产线中形成精益生产线,极大地加速了生产流程对接,使效率翻倍。
应用推荐