In order to overcome the large delay and the uncertainty of the main-stream temperature object in fossil-fired power station, a control system based on neural network is proposed.
针对火电厂主汽温被控对象的大迟延、模型不确定性,设计了基于神经网络的主汽温控制系统。
In order to overcome the large delay and the uncertainty of the main-stream temperature object in fossil-fired power station, a control system based on neural network is proposed.
针对火电厂主汽温被控对象的大迟延、模型不确定性,设计了基于神经网络的主汽温控制系统。
应用推荐