• The paper described the development plan, the selection of seam location and the arrangement methods of main roadway in Jinchang Coal Mine from the designing aspect under present geological condition.

    现有矿井地质条件下,设计方面论述晋昶煤矿开拓方案选择大巷层位设计大巷布置方式

    youdao

  • The main factor causing destruction of roadway in tectonic stress field is found to be the high tensile strain, which appears after the coal seam above haulage roadway is mined.

    提出构造应力场中,开采运输巷道上方煤体使巷道产生拉伸形变巷道破坏主要根源。

    youdao

  • The main factor causing destruction of roadway in tectonic stress field is found to be the high tensile strain, which appears after the coal seam above haulage roadway is mined.

    提出构造应力场中,开采运输巷道上方煤体使巷道产生拉伸形变巷道破坏主要根源。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定