• Using these methods, the stabilization of the diversion of a large-scale hydropower station was analyzed. According to the result, the designer could make a more rational tunnel structure.

    采用方法大型水电站左、右岸导流洞围岩稳定进行计算和分析,室结构设计提供有效的数值参考。

    youdao

  • Using these methods, the stabilization of the diversion of a large-scale hydropower station was analyzed. According to the result, the designer could make a more rational tunnel structure.

    采用方法大型水电站左、右岸导流洞围岩稳定进行计算和分析,室结构设计提供有效的数值参考。

    youdao