• Work out material requirement plan in SAP based on rolling production plan.

    根据滚动生产计划SAP 系统中管理和制定物料计划。

    youdao

  • Run Material Requirement Plan against Forecast and output material requirement plan, monitor material availability.

    根据收到的销售预测操作运行物料需求计划报表输出物料计划并监督执行。

    youdao

  • Meanwhile it measured the material quality and determined the material utilization ratio and strengthening principal. In the light of use requirement, a seismic strengthening plan was given.

    确定主要承重构件材料性质加固改造中可利用程度加固原则,结合使用要求提出对原结构的抗震加固方案。

    youdao

  • Meanwhile it measured the material quality and determined the material utilization ratio and strengthening principal. In the light of use requirement, a seismic strengthening plan was given.

    确定主要承重构件材料性质加固改造中可利用程度加固原则,结合使用要求提出对原结构的抗震加固方案。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定