• This paper gives brief description of new technique and new methods applied in construction survey for headrace tunnel at Shiziping hydropower station.

    阐述了狮子坪水电站引水隧洞洞内施工测量运用工艺方法

    youdao

  • Through introducing the construction survey and precision requirement, to expound the application of the new survey technology to construction survey.

    通过介绍施工测量精度要求阐述测绘技术施工测量中的应用

    youdao

  • This paper introduces the main steps of the planning survey in the construction of new countryside, and expounds some problems needing attention in the work of the planning survey.

    介绍农村建设规划测量主要步骤阐述了规划测量作业一些需要注意问题

    youdao

  • In additional control survey of route construction, how to use the coordinates of old control points affects both the precision of new coordinate and the difference between old coordinate and the new.

    线路施工补充测量控制中,对先期控制点坐标如何使用关系坐标的网形精度与老坐标差异程度。

    youdao

  • In additional control survey of route construction, how to use the coordinates of old control points affects both the precision of new coordinate and the difference between old coordinate and the new.

    线路施工补充测量控制中,对先期控制点坐标如何使用关系坐标的网形精度与老坐标差异程度。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定