Proving the feasibility of the model through the application of the nuclear power project management maturity evaluation model.
并通过核电工程项目管理成熟度评价模型的应用,证明了模型的可行性。
For the nuclear power project, high safety, costing long time and the complicatenature have to be considered in the schedule objective.
核电工程项目的安全性、长期性、繁杂性等特点,使得核电工程项目的进度管理有着属于自己的鲜明特点。
Braided rope, net and many other products have got good application in national nuclear power project, shipping and other special events.
制作的绳索、网具和其他多种产品产品已在国家核电工程、船舶航运、和其他特殊用途上取得了良好应用。
Fuqing, Fang Shan nuclear power project are two important groups in the nuclear power projects, currently works in an orderly nervous to move forward.
福清、方家山核电工程是中核集团两个重要核电项目,目前工程紧张有序向前推进。
The second phase extension projects of Qin Shan as well as Qin Shan nuclear power plant which is called Fang Jia Shan nuclear power project, have begun to construct.
秦山二期扩建项目和秦山核电厂扩建项目方家山核电工程也已动工建设。
Finally, the thesis systematically explains the application value and condition of the evaluation model of nuclear power project risk, and also expects its application foreground.
文章最后对核电项目风险评价模型的应用价值和应用条件做出了系统阐述,并就其应用前景做出了展望。
The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test.
分析表明,核电工程建设的关键路径是核岛土建、核岛安装、与一回路冷态调试相关的单系统调试及联合调试。
Nuclear power project prophase file refers to the documents produced during the project - licensing, approving, bidding, surveying, design, and construction preparation before project kickoff.
核电项目前期文件是指核电工程开工以前在立项、审批、招投标、勘察、设计以及工程准备过程中形成的文件。
For example, our cooperation in Galieo project, Airbus, nuclear power and the fourth-generation small scale nuclear technologies which king of Belgium mentioned to me this morning.
比如,伽利略计划合作、空客的合作、核电合作,今天上午比利时国王还跟我提及第四代小型核技术合作。
The Chashma Project III & IV mentioned in recent media reports are carried out according to the cooperative agreement in nuclear power signed by China and Pakistan in 2003.
近日媒体报道中提及的恰希玛三期、四期项目,是根据中巴两国2003年签署的有关核电领域合作协议开展的。
They had called this project “The Peaceful Atom” and so was the called the reactor of the first nuclear power plant.
这项建设工程曾被称为“和平利用原子能”,因此就有了第一个核电站反应堆。
The China-Russia crude oil pipeline project kicked off smoothly and both sides entered into new consensus in such fields as nuclear energy, power and natural gas.
中俄原油管道项目顺利启动,双方在核能、电力、天然气等能源领域达成新的共识。
The four-country replacement project has strong Latvian support, but Poland is lukewarm and Estonia is considering a small nuclear-power plant of its own if the joint one falls through.
拉脱维亚强烈支持其四国的替换项目(即Visaginas新核电厂,以它替换原先的Ignalina),但波兰态度冷淡,爱沙尼亚也正在考虑如果合建的核电厂失败,它将自行建造一座小型核电站。
A large amount of reinforcing bar mechanical splicing and anchor block have been adopted in the reinforcing bar project of the Nuclear Island of Ling 'ao Nuclear Power Station.
岭澳核电站核岛钢筋工程中,大量采用了钢筋机械接头与锚固块。
Although supplies of uranium fuel were known to he limited and might become exhausted in half a century, the nuclear power plant has for a long time been a favorite project.
尽管大家知道铀燃料的供应是有限的,而且可能在半个世纪内耗尽,原子能发电站多年来却一直是特别受人喜爱的项目。
The moisture separator reheater which used in nuclear power station was a complex structure, the NDT was according to British standards and French ALSTOM project standards.
核电站用汽水分离再热器结构复杂,无损检测按英国国家标准和法国ALSTOM公司工程标准进行。
Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station.
工程管理信息系统是核电站建造管理的重要基础设施和手段。
The model selected for this "Generation 2.5" nuclear power plant is based on the one currently being installed at Ling Ao 2 extension project, under a contract signed in May 2005.
此次核电厂的选型是于2005年5月签订的合同,是在目前岭澳2次扩建工程安装基础之上的。
The emphasis of this project is to present threshold value of blasting vibration strength to ensure structure and apparatus of nuclear power station safe.
本项目重点在于提出确保核电站结构及设施安全的爆破振动强度的阈值。
ABSTRACT: the document system of AP1000 commissioning and operating is very complicated. But the document system is one of the most important parts in the nuclear power plant project management.
摘要:AP1000调试与运行文件系统复杂,其文件管理是整个电厂管理体系中的重要组成部分。
For better social and economical benefits, 18 months fuel cycles project has been implemented at Daya Bay Nuclear Power Station.
为了使核电厂具有更好的社会经济效益和安全质量效益,大亚湾核电厂实施了18个月换料现场技术改造。
The earth and rock excavation of the plant area of the 3rd heavy water reactor project of Qinshan nuclear power plant was of two hill-bodies linked up with Qinshan hill and Huaxiang Co.
秦山三期重水堆工程厂区土石方开挖为两座与秦山相连的山体,华湘公司承担该项工程任务。
The problem can be traced to the nuclear-power program and a highway network project, financed jointly by the state and six private business.
这个问题可以追溯到核电动力计划和公路网工程。这些计划和工程是该州与六家私人企业联合兴办的。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
应用推荐