-
The three piles are driven 10 to 20 metres into the seabed depending on soil conditions and ice loads.
依据海底土壤和积冰负荷的情况,钢桩会被打入海底10米至20米深。
youdao
-
The three piles are driven 10 to 20 metres into the seabed depending on soil conditions and ice loads.
依据海底土壤和积冰负荷的情况,钢桩会被打入海底10米至20米深。
youdao