• On this basis, UPFC installation site comprehensive quantitative evaluation method is analyzed under the power market.

    基础上分析了电力市场UPFC安装地点综合定量化评价方法

    youdao

  • This paper introduces the parameter selection, installation, grounding mode of low-voltage power grid and construction method of residual current operated protective device.

    文中详细论述剩余电流动作保护装置参数选用安装要求,低压电网接地方式安装施工要求等

    youdao

  • This paper introduces the parameter selection, installation, grounding mode of low-voltage power grid and construction method of residual current operated protective device.

    文中详细论述剩余电流动作保护装置参数选用安装要求,低压电网接地方式安装施工要求等

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定