The prestressed concrete beam bridge with corrugated web has greatly improved the traditional prestressed concrete beam bridge.
波纹钢腹板预应力混凝土梁桥是对传统的预应力混凝土梁桥的一次重大改进。
The main difficulty in analysis of unbonded prestressed concrete beam bridge is the coupling between the sectional strength of member and the whole structural deformation of member.
分析无粘结预应力混凝土梁桥的主要困难,在于构件的截面强度和构件整体变形耦合。
The long-span prestressed concrete beam bridge is likely to craze in operation, which decreases the bridge's safety and durability and then leads to its structure's early failure and destruction.
运营中的大跨径预应力混凝土梁桥箱梁普遍开裂,严重影响了桥梁结构的安全性和耐久性,造成了桥梁过早的失效和破坏。
The traditional steel beam reaction system was substituted by prestressed concrete reaction system in the ultrahigh static loading tests of bored piles of Fuxing Bridge.
在复兴大桥超高吨位灌注桩的静载试验,预应力混凝土反力装置替代了传统的钢梁反力系统。
Compared with prestressed rebar concrete beam, its stiffness is more little. Especially in the-big-span bridge, its deflection is a important control factor which influence its application.
与预应力钢筋混凝土梁相比,其刚度较小,特别是在大跨径桥梁中,其挠度变形是影响其应用的重要控制因素。
Xiamen Yinhu bridge is a partially cable-stayed prestressed concrete bridge, whose pier, tower and beam are consolidated together.
厦门同安银湖大桥是国内第一座使用环氧全涂平行钢绞线斜拉索的预应力混凝土部分斜拉桥,墩塔梁固结体系。
By a actual engineering example in Leikou bridge, the design of prestressed concrete T-frame bridge hanging a beam.
通过磊口大桥工程实例,对带挂梁的预应力混凝土T型刚构桥的设计进行总结。
With its excellent section characters, the prestressed concrete box beam plays a main role in the girder bridge.
预应力混凝土箱梁以其优良的截面性质在梁桥中占据了主要地位。
Then the gray system theory is applied in the construction control of long-span prestressed concrete continuous beam bridge.
从而将灰色系统理论成功应用到大跨度预应力砼连续梁桥的施工控制中。
And during the cantilever construction of the prestressed concrete continuous rigid frame bridge, the beam axis shape of formed blocks can't be regulated during the subsequent constructions.
而且,在预应力混凝土连续刚构桥悬臂施工过程中,已建成梁段的线形在后期施工中是不可调整的。
In this paper, some design principles and construction methods of a new type composite continuous beam bridge with partially prestressed concrete have been put forward.
本文提出了一种新桥型——部分预应力混凝土组合连续梁桥的设计原理与施工方法。
The main bridge of Sanmenjiang Bridge in Liuzhou is a 3-span partial cable-stayed prestressed concrete box beam bridge with two pylons and double cable planes.
柳州三门江大桥主桥为双塔、双索面、三跨部分斜拉预应力混凝土箱梁桥。
Base on the above theoretical analysis, the article carries on the time-dependent system reliability analysis to some prestressed concrete continuous beam bridge.
基于以上的理论分析,本文对某预应力混凝土连续梁桥进行时变系统可靠度分析。
However, too much creep generally appeared in prestressed concrete simply supported beam bridge in use.
但在现役桥梁中,却普遍出现了梁体徐变上拱过大的问题。
However, too much creep generally appeared in prestressed concrete simply supported beam bridge in use.
但在现役桥梁中,却普遍出现了梁体徐变上拱过大的问题。
应用推荐