Frequency signal is a primary input to hydro turbine governor control system.
频率信号是水轮机调速器控制系统基本的输入量。
Through the analysis of several kind of turbo-generator control system, the new concept is proved to be an overall description of primary frequency regulation.
通过比较分析几种汽轮机调节系统的一次调频动态特性,证明采用一次调频动态特性概念可以本质、全面地反映汽轮机调节系统的一次调频特性。
Optimization of such strategies as decoupling control and primary frequency modulation was adopted at the same time to make the unit meet the requirement of AGC operation even more.
另外,采用解耦控制和一次调频等策略的优化,使机组更适应AGC守口子运行的要求。
Influenced by joining the primary frequency modulation and the coal quality variation, the new problems were faced to the large generating sets steam temperature control.
受参与一次调频和煤质波动的影响,大型机组汽温控制面临新的考验。
Influenced by joining the primary frequency modulation and the coal quality variation, the new problems were faced to the large generating sets steam temperature control.
受参与一次调频和煤质波动的影响,大型机组汽温控制面临新的考验。
应用推荐