Immediately establish an additional inspection activity over and above the current process control plan, which includes a monitoring and reaction process.
在目前的过程控制计划之外迅速建立一个额外的检验行动,包括监督和反应过程在内。
Do the process control plans(normal and GP-12) agree with the actual process? Do production part checks and statistical monitoring take place as outlined on the process control plan?
过程控制计划(一般的和GP-12)是否与现行过程相符?是否按过程控制计划作零件检验和统计监测?。
In this paper Hydrogen - making PSA process is introduced and also introduced is that automatic switch process control plan is realized on the control system of the OMRON middle type PLC.
本文介绍了变压吸附制氢工艺及工艺流程自动切换控制方案在OMRON中PLC控制系统上的实施过程。
It embodies the idea that can predict and plan in advance, control during the process, and calculate & analyze afterwards.
它能够使预见性的想法和提前的规划具体化,通过控制进程,计算和分析过往数据。
It embodies the idea that can predict and plan in advance, control during the process, and calculate &analyze afterwards.
它能够使预见性的想法和提前的规划具体化,通过控制进程,计算和分析过往数据。
Process Validation Plan defines a set of tests that can be used to validate that an automated software development process fulfills control objectives.
过程验证计划(Process Validation Plan)定义了一系列用来确认自动化软件开发过程实现了控制对象的测试。
All changes to the project management plan flow through the change management process and integrated change control.
所有关于项目管理计划的变更遵守变更管理流程并置于变更控制之下。
This process results in a project management plan that is updated and revised through the Integrated Change Control process.
这一过程的结果使项目管理计划通过整体变更控制过程得以更新与修改。
Teaching administration of College is a process that the first line teaching units directly plan organizing control and coordinate the teaching jobs in order to finish the teaching goals.
学院教学管理是直接面向教学第一线的教学单位为实现培养目标而对教学工作进行的计划、组织、控制、协调的过程。
The theory and practice of realizing the plan progress control of basic construction process and tracing management with computer technology were introduced.
介绍了应用计算机技术实现基本建设过程计划进度控制和跟踪管理的理论及实践。
It includes the product development, purchasing and stock management of the raw materials, the plan and control of the order process, the quality management for the process, etc.
其中包括订单产品开发,物料采购和库存管理,订单生产流程的计划和进度管理,订单生产过程质量管理等。
The functional design of the system is divided into designs of main body, manage module, data flaw analysis, and item prophase, plan, process control etc.
系统功能设计分为整体、管理模块、数据流程分析及项目前期、计划、项目过程管理的功能设计。
The controls used for the manufacturing process in the control plan did not conform to the actual operation.
控制计划中制造过程控制的控制方法与实际操作不一致。
Moreover sampling plan determined by the factors such as sampling risks was related to the process efficiencies including process quality control and inspection cost control.
而由抽样风险确定的抽样方案直接关系到加工过程质量控制和检验成本控制等加工效率问题。
The control plan shall? list the controls used for the manufacturing process control, including methods for monitoring of control exercised over special characteristics.
控制计划应列出用于制造过程控制的控制方法,包括监视控制特殊特性的方法。
The technological process of flash welding and the characteristic of electricity control are analyzed. The control plan with PLC, ladder diagram and the program are put forward.
分析了闪光对头焊工艺过程和电气控制特点,提出采用PLC控制方案,给出了控制系统梯形图及程序。
In view of a kind of typical time-varying parameters of the actual industrial process, based on the model reference adaptive control (MRAC) theory, presents a new adaptive control plan.
针对一类典型的参数时变的实际工业过程,基于模型参考自适应控制(MRAC)理论,提出了一种新的自适应控制方案。
The realtime process MRAC calculation using the plan can be used to improve the spstem realtime information process ability, and forther, the spstem control speriality.
采用本方案实时并行处理MRAC算法可以提高系统的实时信息处理能力,进而改善系统的控制性能。
The study points out the management control process and the fit ways of control, the feedback plan control and the goal control.
指出了管理控制过程以及适用的控制方式,即闭环计划控制与目标控制。
L2 process control level takes charge of making criterion and plan of production, collecting process data, enacting some parameters and calculating some mathematic models.
L2过程控制级负责生成生产计划和标准,进行过程数据收集和一些控制数据的设定。
Based on MCS-51 single chip computer, a real time parallel process plan for the typical self tuning control algorithm is presented in the paper.
本文对典型的自校正控制算法提出了一种基于MCS - 51单片机的并行处理方案。
Control of Work transfer - Moved from clause 7.5 (Production) to clause 7.1 to add emphasis on having a process to plan and control of transfer activities.
转移工作的控制-把原来7.5条(生产)这条要求移动到7.1条来。强调要有一个过程来策划和控制各项转移工作活动。
How to apply plan management, process management, control of cost of software engineering are studied in the middle and small software development enterprises.
研究了软件工程项目计划管理、项目进度管理、成本控制技术在中小软件开发企业中如何应用。
The technology economic evaluation of construction change plan is the important link of construction project change management in the process of construction project change control.
而建设项目工程变更控制过程中,工程变更方案的技术经济评价是建设项目工程变更控制管理的重要环节。
The key of TQM in TV dramas shooting is to set up crew, make shooting plan and control and check the quality of shooting during the process.
电视剧摄制过程的全面质量管理活动的关键,在于组建摄制组、制定拍摄计划,并在拍摄过程中进行严格的质量控制和质量检查。
This article introduces overall plan for the system, the hardware design, the control operation, the software design as well as the entire installment and debugging process.
本文详细地介绍了系统的总体方案、硬件设计、控制运算、软件设计以及安装和调试的全过程。
This article introduces overall plan for the system, the hardware design, the control operation, the software design as well as the entire installment and debugging process.
本文详细地介绍了系统的总体方案、硬件设计、控制运算、软件设计以及安装和调试的全过程。
应用推荐