They faced some hostile questioning over the cost of the project.
关于这个项目的费用,他们面临着咄咄逼人的盘问。
But congressional staffers fret that the project will eventually cost billions more.
但国会的工作人员们担心这个方案最终会多花几十亿。
The project which began in 2007 is supposed to cost a total of 8,000,000,000 dollars.
该项目始于2007年,预计总造价为80亿美元。
The cost we project for saving civilization would amount to less than $200 billion a year, 1/6 of current global military spending.
我们预计每年用于拯救文明的开支合计不到2000亿美元,相当于目前全球军费开支的六分之一。
Yet the cost we project for saving civilization would amount to less than $200 billion a year, 1/6 of current global military spending.
然而,我们预计每年用于拯救文明的开支合计不到2000亿美元,相当于目前全球军费开支的六分之一。
The project was estimated to have cost 570000 yuan.
估计这项工程花费了57万元。
What percentage of your project cost arises from avoidable rework?
项目成本的百分之几是来自不可避免的重做?
Not only had the project cost far more than it was supposed to, but a city spiraling toward bankruptcy didn't exactly need millions more square feet of office space.
不仅项目成本远超过预算,而且一个成螺旋式状接近破产的城市并不需要更多的百万平方英尺的办公室空间。
For example, a metric that does not correlate to the project cost or duration cannot aid in assessing the variance reduction in the iterations.
例如,与项目成本或持续时间无关的度量标准不能帮助评估迭代中的方差削减。
Reuse of assets can in many cases lead to reduced project cost; and for proven assets, their reuse often means higher quality in new applications.
在很多情况下资产的复用导致更低的项目成本;而对经过验证的资产,对它们的复用通常意味着新应用程序的更高质量。
While test engineers cannot estimate total project cost, they can certainly estimate testing contribution to cost, and suggest test risks and feasibility.
虽然测试工程师不能估算总的项目成本,但是他们的确可以评估对成本的测试贡献,并且提出测试风险和可行性。
For example, a great deal of effort is put into producing valid and reliable data for software project cost estimates.
例如,大量的工作用来为软件项目成本估算产生有效和可靠的数据。
This discovery represented a $30 million project cost avoidance for the VA. 7
这个发现表明 VA 可以免去三千万美元的项目成本。
The solution was rolled out to all 37 financial institutions within Synovus at no additional project cost.
在没有增加项目成本的情况下,解决方案在Synovus旗下所有37家金融机构中得到了实施。
Assessing technical viability and estimating overall project cost.
评估技术可行性并且估计全面的项目成本。
Using this theory, the cost controlling method of drilling and completion projects can be regulated so as to reduce the project cost and make work and management more efficiency.
这种思路的提出,可以规范钻完井项目成本控制方法,为项目降低成本、提高工作效率和管理水平具有一定的指导性。
For example, a scope change will almost always affect project cost, but the scope change may or may not affect team morale or product quality.
例如,项目范围的改变几乎总会影响项目的费用,但并不一定会影响项目团队的士气或者产品的质量。
Assist in setting up the project cost follow-up report, according to the projects financial management, prepare the monthly analysis for variation.
根据项目财务管理要求,协助部门经理建立项目成本跟踪报告,按月分析,报告差异。
The cost control in the construction phase is the key for construction enterprises effectively control project cost control.
施工阶段的成本控制是施工企业能否有效进行项目成本控制的关键。
Therefore, the high-speed railway construction enterprises must carry out the project cost control in order to ensure economic efficiency.
因此,高速铁路施工企业必须进行项目成本控制,才能保证经济效益。
Therefore, understanding the forced mechanism of soil anchor bolting to design competence, reduce project accident and reduce project cost has directive significance at present.
因此,了解土层锚杆受力机理对目前锚杆设计水平和减少工程事故及降低工程造价具有指导意义。
High speed rail, is a prerequisite for the highway facilities, it can affect the safety of road traffic, the speed of the road, the natural landscape beside the highway project cost and so on.
高速护栏板,是高速公路上的必备设施,它在一定程度上可以影响到路上行车的安全,行车的速度,公路旁边的自然景观以及公路上工程的造价等等。
They are designed to provide advisory services, project cost control, engineering and equipment, material bidding. project management consultancy services.
为所服务项目提供设计咨询,工程成本控制,工程及设备、材料招投标,工程项目管理等顾问服务。
In assessing project cost we will have particular regard to the current downward trend in construction costs.
在评估工程造价时,我们亦会特别考虑到目前成本回落的因素。
These allowances are included in project cost estimates to accommodate unforeseen events and the resulting costs.
为了应付不可预见事件和由此产生的成本,通常在项目成本估算中要安排一定数量的储备金。
These allowances are included in project cost estimates to accommodate unforeseen events and the resulting costs.
为了应付不可预见事件和由此产生的成本,通常在项目成本估算中要安排一定数量的储备金。
应用推荐