Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.
质量活动必须使成本和进度处于项目的控制之下,以满足CMM的精神。
Plan and schedule control, cost control, quality control and safety control are important parts of project management.
计划与进度控制、成本控制、质量控制和安全控制是工程项目管理的重要组成部分。
Present international conventional "earned value evaluation principle" as well as how to combine the earned value with project schedule control and cost control organically were also expounded.
阐述当前国际通用的赢得值评估原理,以及如何将赢得值与项目进度控制和费用控制有机地联系起来。
Project earned value management is the most effective co-ordinate control methods of cost and schedule by far, but our research on the earned value management is still very limited.
项目挣值管理是迄今为止最有成效的一种进度与费用协调控制方法,然而我国对挣值管理的研究还很有限。
But the important means to achieve these two objectives at the same time is the Earned Value Method which is mean of project cost and schedule co-ordinate control.
而同时实现这两个目标的重要手段就是通过挣值法对工程项目费用与进度进行协调控制。
The case study indicates that the method proposed in this article can effectively plan and control project cost and schedule objectives.
实例研究表明,本文提出的方法可更好地计划和控制项目的费用及进度目标。
Particularly, this thesis has given in-depth discussion about implementation procedure of project management and schedule (or quality or cost) control with matrix management.
论文特别对项目管理实施程序及矩阵式管理过程中如何实施进度、质量、费用等控制进行了较深入的探讨。
The new market situation brings forward a higher demand for the cost, schedule and control of the construction project.
在新的市场形势下,对工程项目建设的出成本、进度、控制提出了更高的要求。
The new market situation brings forward a higher demand for the cost, schedule and control of the construction project.
在新的市场形势下,对工程项目建设的出成本、进度、控制提出了更高的要求。