Aimed at the design demand of high RCC gravity dam for Longtan project that is about to start, the results of studies will provide the important reference basis.
研究工作针对龙滩高碾压混凝土重力坝设计的需要,其成果为即将开工的龙滩工程建设提供了重要的参考依据。
In this article three dimension FEM is adopted in the stress analysis of bottom diversion outlet and notch segment of a RCC gravity dam when flowing design flood.
本文采用三维有限元法,对碾压混凝土坝底孔缺口坝段在过流情况下,顶部未到设计龄期的碾压混凝土和大型导流底孔周边的应力分布进行了分析。
Because of high temperature in South China, it is necessary to solve many difficult scientific problems in order to construct the highest RCC gravity dam in the world.
在我国南方高气温地区建造世界上最高的RCC重力坝,需攻克许多科技难题。
In addition, according to measured temperature data of a RCC gravity dam, the thermal parameters inversion is done, whose result is used to calculate the temperature field again.
此外,本文结合某碾压混凝土重力坝工程,依据现场采集的坝体温度资料,对碾压混凝土热学参数进行反演,利用反演结果进行温度场反馈计算。
The stress field of RCC gravity dam is the main factor to lead to the dam crack, the stresses caused by the other factors are less than temperature stress field, which function is for controlling.
碾压混凝土坝温度应力是导致坝体裂缝的主要因素,其他荷载所引起的应力与温度应力相比相对较小,温度应力起控制作用。
It researches displacement and dam body deformation extent. And it tries to find a control range for RCC gravity-arch dam displacement by comparing with other international projects.
研究坝体变位大小和坝体变形的范围,比较其它工程及国际工程经验,探索碾压混凝土重力拱坝坝体变位控制范围。
It researches the stress condition, stress distribution, location of maximum stress and stress control criteria of RCC gravity-arch dam under different load combinations.
研究碾压混凝土重力拱坝在不同的荷载组合工况下的应力分布状态和分布特征以及最大应力出现的位置和应力控制的标准。
It researches the stress condition, stress distribution, location of maximum stress and stress control criteria of RCC gravity-arch dam under different load combinations.
研究碾压混凝土重力拱坝在不同的荷载组合工况下的应力分布状态和分布特征以及最大应力出现的位置和应力控制的标准。
应用推荐