• Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.

    万安水电站二期主体工程溢流坝6 ~15坝段左岸溢流坝5坝段部分采用碾压混凝土筑坝技术。

    youdao

  • Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.

    万安水电站二期主体工程溢流坝6 ~15坝段左岸溢流坝5坝段部分采用碾压混凝土筑坝技术。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定