The stress relief method of hole diameter deformation was used to measure the stress distribution of the pillar structure in the mined area in a big phosphate mine.
采用孔径变形应力解除法,测量了某大型磷矿采空区中矿柱结构的应力分布规律;
The results present that the forging load decreases when a suitability diameter of relief-hole is chosen, but the function is not obvious.
结果显示,选择适当的分流孔尺寸可以降低成形载荷,但作用不很明显。
The results present that the forging load decreases when a suitability diameter of relief-hole is chosen, but the function is not obvious.
结果显示,选择适当的分流孔尺寸可以降低成形载荷,但作用不很明显。
应用推荐