That both the structure and material of concrete dams and construction means of earth dams are used in roller compacted concrete dams make RCC dam increasingly used in water engineerings.
碾压混凝土将混凝土坝结构和材料与土石坝施工方法两者的优越性结合起来,在水利工程中得到愈来愈多的运用。
Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).
胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。
Based on the analysis of the seepage reasons of the roller compacted concrete, a design idea against seepage of the RCC dam is developed in this article, in which anti seepage is the stress.
在碾压混凝土渗透成因分析的基础上,本文提出以防为主,防排结合的碾压混凝土坝体渗控设计概念。
Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.
万安水电站二期主体工程溢流坝6 ~15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。
Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.
万安水电站二期主体工程溢流坝6 ~15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。
应用推荐