The main parameters of the hydraulic support, such as working resistance, setting load and support height are analyzed.
对该类支架的工作阻力、初撑力、支护高度等主要参数进行了分析计算。
The main parameters of the hydraulic support, such as working resistance, setting load and support height, are analyzed and its main structures are design.
本文对该类支架的工作阻力、初撑力、支护高度等主要参数进行了分析计算,并对其主要结构进行了设计。
The study indicates that elastic modulus of the fallen rock in the goaf, the rigidity and setting load of support are the major factors that affect roof behaviour.
研究表明,采空区矸石弹性模数、支架刚度及初阻力是影响顶板动态的主要因素。
Under permissive load range, this scheme is conducting setting load spectrum experiment through adjustable input of the test bad, this makes the test time effectively decreased.
在允许的载荷输入范围内,该方案通过实验台加载力的可调输入,进行设定载荷谱试验,使试验时间有效缩短。
If the setting is at 20 and all 20 data source connections are fully utilized under load, then increase the setting to 30.
如果最大值的设置是20且所有20个数据源连接在负载下被完全利用,那么请把最大值的设置增加到30。
The Objective-C runtime will then try to load that window when your application runs, and will find your application delegate from the setting in that file.
在应用程序启动的时候,Objective-C运行时将会尝试去加载那个文件,并根据这个文件内的设置来查找应用程序委托类。
So it's either populating the controls, setting view state, applying themes, etc., everything happens on the page load.
因此,不是填充控件、设置viewstate、应用主题等一切都发生在页面加载上。
Run that with a high load setting and ensure that your server stays up until the load test finishes.
以一个高的负载设置运行那个工具以确信你的服务器能够承受直到测试结束。
Setting threshold to 200 causes image to load 200 pixels before it appears on viewport.
阈值设置为200年导致图像加载之前出现在视窗200像素。
You'll learn how to run remote tests with increased user loads, including setting up remote machines for distributed load generation.
您将学习如何使用IBM Rational Performance Tester通过增强的用户负载运行远程测试,包括如何为分布式的负载发生器设置远程机器。
Load a different (or changed) XML file, and you have a new look. Listing 2 shows just what setting a program's look and feel to Synth looks like.
装入不同的(或修改过的)XML文件,您就有了一个新的外观。
The initial run setting is created using the New Load Test Wizard which is covered in step 4 in the next section.
使用“新建加载测试向导”创建初始运行设置(下一节的步骤4中对此进行了说明)。
Here, you can compress the Clip into Ogg Vorbis format, force it into Mono or Stereo playback, and tweak other options, such as the very important Decompress on Load setting.
在这里,你可以压缩成ogg格式,强制单声道或立体声播放,并调整其他选项,比如很重要的加载时解压设置。
Use this setting to load symbols for all modules in the symbol file locations, except for modules designated in an exclude list.
使用此设置可以加载符号文件位置中所有模块的符号,但排除列表中指定的模块除外。
You can create and store multiple run settings for each load test, and then select one particular setting to use when you run the test.
可以为每个负载测试创建和存储多个运行设置,然后在运行测试时选择一个要使用的特定设置。
The setting range of no load voltage step response index for self excited shunt excitation system is put forward.
对自并励静止励磁系统发电机空载阶跃指标提出整定范围。
You can configure the test setting that you are using with your load test to specify that you want to use 64-bit processes.
您可以设定要搭配负载测试使用的测试设定,以指定想要使用64位元处理序。
A programmable slew rate allows a controlled transition from one load setting to another to minimize induced voltage drops on inductive power wiring, or control induced transients on a test device.
带有编程控制的转化速率可以控制从一种负荷装置转换到另一装置,以降低电力布线上感应电压降,或控制测试设置上的感应瞬变电流。
It has discharge models of constant-current. After setting parameter, it can achieve capacity test to battery and load capacity test to DC power.
恒流放电模式,参数设定后自动完成蓄电池组的容量测试或直流电源的带载能力检测。
Switching your temperature setting from hot to warm can cut energy use in half for washing one load.
切换您的设定温度从热热身可以减少能源使用量的一半作洗濯一负荷。
Setting this option is not recommended since globally encrypting AFP connections via SSH will increase the server's load significantly.
大意是说不建议打开这个选项,因为这会明显导致服务器的负载增加。
By setting up finite element model, the load stress and the warping stress of the two materials pavement are calculated and compared.
建立有限元模型,计算配置两种材料道面的荷载应力与翘曲应力并进行比较。
When a load test is run, it USES the run setting that is currently set as active.
负载测试执行时,它会使用目前设为使用中的回合设定。
It has been applied to building electricity plan design, secondary drawings design, marking, devices statistics, linestyle setting and power system load calculation etc.
可应用于建筑电气的平面图设计、系统图设计、二次接线图设计、标注、设备统计、线型设置、负荷表计算等方面。
For exerting the functions of the automatic under-frequency load-shedding device, setting for the device should be calculated correctly.
为有效发挥自动低频减负荷装置的重要作用,应正确进行装置定值的整定。
The result is trend-setting hybrid technology that provides superior fuel economy, performance and load carrying potential.
结果是近来的混合动力技术,提供解放油罐车优质的燃油经济性、性能和承载潜力。
The setting is introduced on the relationship between primary frequency modulation speed difference and primary frequency modulation load for current modulated type steam turbines with base-load.
介绍了目前电调型带基本负荷汽轮机的一次调频转差与调频负荷关系曲线的设置情况。
HV and EHV transmission lines are equipped with split-phase breaker. If a longer reclosing time is setting in a heavy load line, the system may swing after the trip without fault of remote breaker.
高压、超高压输电线路的开关为分相开关,当对侧开关单相偷跳后,在线路负荷比较重、同时重合闸动作时间比较长的情况下可能引发系统振荡。
The traditional upgrading way of progressive spot setting programme or changing program chip about load management system needs large manpower, material resources and time.
负荷管理系统的逐户现场固化编程或更换程序芯片的传统升级方式须耗费大量人力、物力及时间。
The traditional upgrading way of progressive spot setting programme or changing program chip about load management system needs large manpower, material resources and time.
负荷管理系统的逐户现场固化编程或更换程序芯片的传统升级方式须耗费大量人力、物力及时间。
应用推荐