• In this article, the author analyzes the causes of abnormal static load test of pipe pile in soft soil stratum, puts forward reasonable advices from design and construction aspect.

    土地质条件下管桩载荷试验异常原因进行研究分析设计施工角度提出合理建议

    youdao

  • An advanced "Sinking Pipe Method" technique has been first used in China in underwater soil foundations in the Yongjiang underwater tunnel project.

    甬江水底隧道工程水下土地基上采用先进的“技术,这国内尚属首次

    youdao

  • The soil pipe in pilot room not follow and this room has not shower, to be repaired and added.

    引航员房间厕所便池粪堵塞房间没有淋浴修理和增加。

    youdao

  • Because of the differences of the roughness, the interflow, the soil moisture and the rainfall intensity, the pipe flow process shows different hydraulic graph.

    由于土管内部粗糙程度分枝合流情况不同土壤前期降雨量、本次降雨强度影响也造成水文过程产生差别。

    youdao

  • The bacteria behind the latest scare, Clostridium Botulinum, is often found in soil. The Fonterra case was caused by a dirty pipe at a processing plant.

    引起这次食品恐慌细菌名为肉杆菌,经常存在土壤中本次事件中,恒天然集团食品加工工厂里水管污染,致使肉毒杆菌进入产品。

    youdao

  • Using the dynamic Finite Element Method, the dynamic soil pressure distribution along the pipe periphery and the free vibration characteristics of the pipe are studied in this paper.

    本文通过动力有限单元周围压力动力作用分布管子的自特性进行了某些探讨。

    youdao

  • For example, if one portion of pipe is in heavy clay soil and another is in well-aerated sandy soil, the portion in the clay will corrode with respect to the portion in the sand.

    例如管道一部分粘土中,一部分在透气好的砂土中,粘土内的管段相对砂土管段被腐蚀。

    youdao

  • According to analysis on the destruction process, treatment advice was put forward on bend buttress pier foundation for laying pipe in soft soil subgrade.

    破坏的过程进行分析提出了软土地基弯管基础处理建议

    youdao

  • Cultivation experiments with sand filter pipe have been carried out to study the effect of different dosage of bentonite on sandy soil fertility.

    沙土通过培养,研究不同膨润土用量土壤肥力影响

    youdao

  • The effect of varying soil properties on axial seismic response of buried pipelines is studied considering the interaction between the pipe and the soil.

    考虑管线土壤之间相互作用研究了土壤性质改变埋地线轴向地震响应影响

    youdao

  • The fire work technology of soil blocking and vapour replacing for pipe maintenance is introduced in the paper.

    介绍了输油管道检修中的泥土封堵动火蒸汽置换动火技术方法。

    youdao

  • Soil pressure control is one of the most important technology of pipe pushing engineering with earth balance shield machine.

    平衡式顶掘进机机头泥土仓土压力控制顶管工程关键技术之一。

    youdao

  • Compactness from 600 mm above the pipe to surface grade shall be at least equal to surrounding soil.

    管道上部600毫米高度处地面标高之间的回填土的压程度至少周围的土质相同

    youdao

  • A new pile-driven technology named air curtain dry soil withdrawal can reduce resistance of a sinking pipe by withdrawing soil from the pipe and installing air curtain on the outside of pipe.

    空气、套管内取土灌注桩这种新的施工工艺通过套管内取土套管外设空气幕来减少沉管阻力

    youdao

  • Its disadvantage is that it presses a large range of soil while sinking the pipe, inducing high resistatance and bring negative effects to surrounding environment.

    缺点过程中大量,沉管阻力较大周围环境造成不利影响

    youdao

  • The stress state of the circular culvert pipe under soil pressure at rest is analysed with the photoelastic simulated test of the epoxy resin model frozn.

    利用环氧树脂模型进行光弹性冻结试验模拟受填压力作用的土坝坝圆型涵管受力状态

    youdao

  • Arranging observation pile has instructive significance to the construction of pre-stressed concrete pipe pile in soft soil foundation.

    设置观测预应力混凝土管桩土地施工具有指导意义

    youdao

  • Findings show that, for be in the wrong frozen soil wrought in favor of thermal disturbance, insulating layer thickness respond adopt dam insulating pipe hull skin temperature 'calculation procedure.

    研究结果表明不对冻土造成较大扰动保温层厚度采用控制保温表面温度计算方法

    youdao

  • Due to the stress of backfilled soil, the asphalt coating at 3:00-9:00 (clock position) is easily disbonding and the CP is shielded, which results in the pipe body corrosion.

    回填土壤应力作用下,管道在3∶00 ~ 9∶00时钟位置石油沥青防腐容易出现剥离屏蔽阴极保护,导致腐蚀。

    youdao

  • Pipe jacking construction disturbs soil inevitably, which would results in soil deformation and does harm to its surroundings.

    施工土体扰动不可避免的,土体变形是土体受扰动的结果土体变形则对周围环境造成危害。

    youdao

  • It is found that the situation near the soil pipe laying and the water pressure in pipe are the main factors.

    经过研究发现管道埋设附近土质情况管道的供水压力主要因素

    youdao

  • Technical scheme, design, construction and application of steel pipe soil nail combining rabbling pile in a foundation ditch support in Shenzhen.

    介绍了深圳基坑支护工程钢管搅拌组合支护技术方案设计施工应用情况

    youdao

  • Based on the resistance method, a method to measure the soil corrosive rate of pipe material reliably is established through improving measuring technology in the paper.

    电阻基础通过改进测试技术建立了可以获得可靠管材土壤腐蚀速率数据测试方法。

    youdao

  • The influence domino effect for pipe and soil caused by construction has been analyzed by using FEM.

    采用有限元分析了曲线顶施工对管节土体影响效应

    youdao

  • Mechanism and types of soil corrosion on buried steel pipe are introduced, and methods of soil corrosion evaluation of site investigation and analysis in laboratory are discussed.

    介绍了土壤地下钢管腐蚀机理类型讨论了土壤腐蚀现场勘测实验室分析评价方法

    youdao

  • The typhoon and stormy waves pulled out the soil beneath the pipe and make it hanging.

    调查发现台风风浪将管道下部的海床掏空。

    youdao

  • The physical model tests were performed to study the influence of pipe drainage system on soil permeability, groundwater level and slope residual downslide thrust.

    为了研究管网渗流系统对土体渗透性能地下水位以及边坡剩余下滑推力影响进行管网渗流系统物理模拟试验

    youdao

  • Both theoretical analyses and field observations have shown that pipe jacking in such a kind of soft soil ground as in Shanghai area, movements of soils around the pipes is of three-dimension.

    理论分析现场实测显示类似上海等地土地层中施工,顶周围运动问题三维的。

    youdao

  • Using the method of top pressure and out soil promoted a comprehensive rectifying deviation to the structure, and using of steel pipe pile method reinforced the base of the tower.

    建于深厚软某铁塔基础周边不均匀填土后产生严重的不均匀沉降,经采用掏土法对构筑物进行综合促沉纠偏,同时采用钢管加固处理,实践表明效果良好。

    youdao

  • By the measured results of pipe to soil polarization potential after one year, it is shown that the design is reasonable and the technical targets fulfil the design requirements.

    实施保护年后管道极化电位检测结果表明,牺牲阳极保护工程设计合理技术指标达到设计规范要求

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定