Some typical characteristics of Qinshan II 650MW nuclear steam turbine during installation were presented and special measures and major problems as well as their management results were introduced.
阐述讨论了秦山二期650MW核电汽轮机在安装过程中的若干典型特点、所采取的特殊措施,以及遇到的主要问题和处理结果。
Some typical characteristics of Qinshan II 650MW nuclear steam turbine during installation were presented and special measures and major problems as well as their management results were introduced.
阐述讨论了秦山二期650MW核电汽轮机在安装过程中的若干典型特点、所采取的特殊措施,以及遇到的主要问题和处理结果。