For fulfilling the instant need of operation training for gas-steam combined cycle unit, the simulator for 390 MW LNG gas-steam combined cycle unit was developed.
为满足对燃气-蒸汽联合循环发电机组培训的需要,研制了390MW液化天然气(LNG)联合循环发电机组仿真机。
The thermal system of HRSGs is introduced for a 700MW-class combined gas-steam cycle unit with multi-shaft arrangement in present paper.
介绍了一套700MW级多轴布置的燃气-蒸汽联合循环机组及其余热锅炉的热力系统。
Taking the minimum cost per unit power generation as the objective function, a thermo-economic optimization model for gas and steam combined cycle power generation system is established.
以单位发电量最低成本为目标函数,建立了燃气-蒸汽联合循环发电系统的热经济学优化模型。
This paper analyzed the problems existing in the commissioning of heat recovery boiler and steam turbine in a175MW gas-steam combined cycle generating unit and put forward the improvement proposals.
针对某175MW燃气-蒸汽联合循环机组中余热锅炉和蒸汽轮机调试存在的问题进行分析,提出改进意见。
The discuss on the use of on-line oxygen analysis and monitoring system in 50MW power plant gas-steam combined cycle generating unit of Chongqing Iron & Steel Co.
通过传统和激光氧含量的原理、组成、测量方式、测量结果及维护使用情况的比较,介绍了激光氧含量在50MW燃气蒸汽联合循环发电机组电捕焦上的使用的情况。
Most of the recommendations were adopted and implemented and the operation indicator of the gas-steam combined cycle unit improved significantly.
大部分意见经现场采纳实施后,机组的运行指标得到明显提高。
Most of the recommendations were adopted and implemented and the operation indicator of the gas-steam combined cycle unit improved significantly.
大部分意见经现场采纳实施后,机组的运行指标得到明显提高。