Then the Works or Section shall be deemed to have passed these Tests after Completion.
则该工程或分项工程应被视为已通过了这些竣工后试验。
Tests to be carried out after completion of all works affecting the water tightness and before fitting the floor covering, the insulation, the lining etc.
该试验应在水密试验完成后和在装配地板敷料,绝缘材料,衬板等前进行。
Unless otherwise agreed, Tests on Completion of Design-Build shall be carried out within 14 days after this date, on such day or days as the Employer's Representative shall instruct.
除非另有商定,此类试验应在该日期后14天内于业主代表指示的某日或数日内进行。
All Factory Test Reports or Certificates and Performance Certificates shall be air-pouched to BUYER right after completion of tests.
所有工厂测试报告或证明书和性能证明书应在测试完成后立即航空邮寄给买方。
Drill stem tests are taken from some Wells almost immediately after drilling and completion operations.
有些井刚钻完并进行完井作业后,就立即采取钻杆测试。
Drill stem tests are taken from some Wells almost immediately after drilling and completion operations.
有些井刚钻完并进行完井作业后,就立即采取钻杆测试。
应用推荐